Exploration Pipeline · updated Nov 1, 2026

What’s coming out of the ground

Drill programs underway and planned, what each company says comes next, and roughly when. Timing is the company’s own guidance; treat it as a rough calendar, not a promise. Tap a program for metres, assays pending and the source.

226programs tracked
128drilling now
122with assays pending
20catalysts due this month
35Nov
66Dec
2Jan
4Feb
19Mar
0Apr
14Later

Expected catalysts by month (results, resource updates, next phases). Pink: due this month; overdue items count toward this month.

Overdue company’s own timing has passed with no update yet 15 programs

OctAssays pendingArctic Minerals AB Nasdaq First North:ARCTHennes Bay (DP-01) · Bergslagen/Vanern region, SwedenDP1 assay results; DP2 progressCuAg

Timing as stated: DP1 assays expected within a month of Sep 22, 2026

  • Program DP1 complete: 12 holes, 4,187m (10 with visible Cu); DP2 (20 holes, ~8,000m, regional MMT targets) started immediately after
  • Metres 4,187 m done of 4,000 m
  • Assays pending DP1 mineralised intervals at lab
  • Stage resource expansion
  • Context Drilling scheduled to complete end-Aug 2026; Exploitation Concession application targeted late 2027; Swan Lake earn-in with Boden Prospektering.

Log

Source: Drilling intersects copper mineralisation up to 600m from historical drilling at Hennes Bay · Sep 22, 2026

SepAssays pendingAzzuro Resources (ex-Asian Battery Metals) ASX:AZ9Yambat - Oval Cu-Ni-PGE / Maikhan Uul Cu-Au · Gobi-Altai, MongoliaRed Hill batch 4 assays; exploration target evaluations for Red Hill and OvalCuNiPtPd

Timing as stated: September 2026 quarter (per June-quarter report)

  • Program Red Hill (Maikhan Uul) Phase 1: 15 holes (12 DD, 3 RC) for 1,883.9 m; Oval: IP survey only (no 2026 drilling reported)
  • Metres 1,884 m done
  • Assays pending Red Hill batch 4 assays
  • Stage discovery
  • Context 2025 Phase 3 at Oval was 40 holes/6,729m; status after June quarter not confirmed in source.

Log

Source: Azzuro Resources Validates 550m Copper-Gold VMS System at Red Hill, Reports $2.853M Cash Reserves · Jul 31, 2026

SepAssays pendingCooper Metals ASX:CPMMt Isa East (Ardmore North, Attina) · Mt Isa, Queensland, AustraliaMaiden RC assaysCuAu

Timing as stated: ~6-8 weeks from 27 Jul 2026

  • Program Maiden RC program, 16 holes
  • Metres 1,984 m done
  • Assays pending All 16 holes (visual chalcopyrite logged, unconfirmed)
  • Stage discovery
  • Context May already have reported; check later ASX release. Also acquired Pyramid Gold Project (Qld).

Log

Source: Rock Chip and Trench Sampling Returns up to 5.36% Cu and 5.16 g/t Au at Ardmore North · Aug 11, 2026

Q3Assays pendingMundoro Capital TSXV:MUNOblez / Tilva Rosh South (Timok) · Timok Magmatic Complex, SerbiaRemaining 26-OBL-05 assaysCuAu

Timing as stated: Q3 2026 (as stated; may be overdue)

  • Program Deep hole 26-OBL-05 drilled to 1,302.7m (BHP option)
  • Metres 1,303 m done
  • Assays pending Remaining assays below 643m in 26-OBL-05
  • Stage discovery
  • Context BHP earn-in under 2025 option agreement. Skorusa East (1,288m, BHP) returned no economic intervals.

Log

Source: Mundoro Q2 2026 results and exploration update · Aug 31, 2026

SepAssays pendingOre Resources ASX:OR3Kangaroo Hills / Miriam · Western Australia, AustraliaRC assay resultsLi

Timing as stated: September 2026 per 19 Aug release; a 10 Sep 2026 ASX release 'Lithium Mineralisation Extended Beyond Mineral Resource' likely reports them but could not be read

  • Program 3,000 m RC drilling plus diamond drilling at Kangaroo Hills
  • Metres 3,000 m done of 3,000 m
  • Assays pending RC assays and diamond geochemistry
  • Stage discovery
  • Context First-pass drilling at Miriam; metallurgical testwork planned at Big Red

Log

Source: Diamond Drilling Reinforces Lithium Prospectivity and Study Advancement at Kangaroo Hills · Aug 19, 2026

AugDrillingCondor Resources TSXV:CNCobreorco · Apurímac, PeruInitial assay resultsCuAu

Timing as stated: early August 2026

  • Program 3,500 m, six-hole diamond program with two rigs, starting June 2026
  • Metres 3,500 m planned
  • Stage discovery

Log

Source: Condor Resources Announces Drilling Program at the Cobreorco Copper-Gold Project, Peru · May 29, 2026

Q3DrillingDenison Mines / Skyharbour Resources TSX:DML; TSXV:SYHRussell Lake JVs · Saskatchewan, Athabasca Basin, CanadaDrill programU

Timing as stated: planned Q3 2026

  • Program 2026 >15,000 m: Wheeler North ~7,500 m/~13 holes (Denison; Fox Lake Trail winter, Fork/Sphinx later); RL 4,000-5,000 m/10-14 holes and Getty East ~3,600 m (Skyharbour)
  • Stage grassroots
  • Context Metres not stated in Denison MD&A.

Log

Source: Skyharbour Announces Major 2026 Exploration Campaign with Denison Mines at Russell Lake Uranium Joint Ventures · Jan 2026

OctDrillingDeSoto Resources ASX:DESTimbakouna (Siguiri) · Siguiri Basin, GuineaDrilling ramp-up; target generation from 6,262 line-km airborne surveyAu

Timing as stated: coming weeks

  • Program 485-hole power auger program, 2 rigs
  • Metres 10,000 m planned
  • Stage grassroots
  • Context Exploration resumed after permit approval

Log

Source: DeSoto Resources exploration update · Sep 1, 2026

OctDrillingPTX Metals TSXV:PTXW2 · Ring of Fire, Ontario, CanadaDetailed exploration strategy releaseCuNiPtPd

Timing as stated: coming weeks (from 14 Sep 2026)

  • Program 5,000m diamond drilling at CA1 Zone plus soil sampling
  • Metres 5,000 m planned
  • Stage discovery
  • Context Drilling resumed after January pause for First Nations discussions. Source is sponsored content.

Log

Source: PTX Metals back in the field at W2 with 5,000-metre program and concurrent soil sampling · Sep 14, 2026

OctDrillingSouth Pacific Metals TSXV:SPMCOsena (Megabe, Ontenu) / Kili Teke · PNG highlands, Papua New GuineaKili Teke drill-ready targets; Ontenu Central assaysAuCu

Timing as stated: end-October 2026 (Kili Teke targets)

  • Program Step-out drilling at Osena; planned diamond program at Kili Teke
  • Assays pending Four completed holes at Ontenu Central
  • Stage discovery
  • Context C$20m financing closed 23 Sep 2026 funds work through year-end 2026.

Log

Source: South Pacific Metals secures $20 million to advance four gold-copper projects through 2026 · Sep 24, 2026

OctDrillingTungsten Mining ASX:TGNWatershed · Queensland, AustraliaInitial assay resultsW

Timing as stated: from October 2026

  • Program ~15,000 m RC (175 holes) + ~5,700 m diamond (75 holes)
  • Metres 20,700 m planned
  • Stage advanced/development
  • Context MRE and preliminary economic evaluation completed June 2026

Log

Source: Tungsten Mining flags major drilling program at Watershed Project · Aug 11, 2026

Q3PlannedCordoba Minerals TSXV:CDBPerseverance · Arizona, USAStart of drilling, subject to permitsCu

Timing as stated: not before late Q3 2026

  • Program Deepen three historic Rio Tinto holes (K-23, K-19, K-13) to test supergene enrichment; ~US$1.7M budget
  • Metres 1,700 m planned
  • Stage discovery
  • Context Cordoba 51% / Bell Copper (TSXV:BCU) 49%; Bell funds 49% of budget

Log

Source: Cordoba Minerals Announces 2026 Exploration Program at the Perseverance Copper Project in Arizona · Jun 8, 2026

SepPlannedDeep Yellow ASX:DYLS-Bend Prospect · Erongo, NamibiaDrilling startU

Timing as stated: September 2026 quarter

  • Program Drilling after ground radiometrics
  • Stage grassroots

Log

Source: Deep Yellow Progresses Tumas Uranium Project with Key Construction Contracts and Targets Q4 2026 Investment Decision · Jul 28, 2026

Q3PlannedUS Critical Metals CSE:USCMMcDermitt East · Nevada, USADrill mobilization (pending permits)Li

Timing as stated: Q3 2026

  • Program Initial RC drill program (claystone lithium)
  • Metres 1,000 m planned
  • Stage grassroots
  • Context Surface samples up to ~2,129 ppm Li; BLM Plan of Operations to be submitted

Log

Source: USCM Announces 2026 Drill Program at McDermitt East Lithium Project · Apr 9, 2026

OctCompleteATEX Resources TSX:ATXValeriano · Atacama, ChilePhase VII drilling start; updated MRECuAuMo

Timing as stated: Phase VII due 'within weeks' as of Oct 1, 2026 (delayed by record snowfall); MRE 2H 2027

  • Program Phase VI complete (~28,400 m, six rigs); Phase VII starting
  • Metres 28,441 m done
  • Assays pending None flagged
  • Stage resource expansion
  • Context MRE update expected 2H 2027

Log

Source: ATEX Resources: Valeriano 2-billion-tonne copper system to enter Phase VII drilling · Oct 1, 2026

Due this month 20 programs

NovAssays pendingAmerican Rare Earths ASX:ARRHalleck Creek (Red Mountain) · Wyoming, USARemaining assaysREE

Timing as stated: over the coming weeks (from Sept 21, 2026)

  • Program 2026 feasibility HQ core drilling, 18 holes
  • Metres 2,877 m planned
  • Assays pending 12 holes (~1,300 samples total program)
  • Stage advanced/development
  • Context Feasibility Study ongoing, no completion date given

Log

Source: American Rare Earths Reports Strong Initial Assay Results from 2026 Feasibility Drilling at Halleck Creek · Sep 21, 2026

NovAssays pendingPantera Minerals ASX:PFEGillham · Arkansas, USAAntimony-silver assay resultsSbAg

Timing as stated: late November 2026

  • Program Maiden diamond program: 9 holes for 906 m beneath Davis, Stewart and May (completed 16 Oct 2026)
  • Metres 906 m done of 1,500 m
  • Assays pending All 9 holes (antimony-silver) at ALS USA, Nevada
  • Stage grassroots
  • Context Targets depth extensions beneath Davis, Stewart and May mines

Log

Source: Pantera Minerals completes first modern drilling at Gillham as antimony and silver assays awaited · Oct 27, 2026

NovAssays pendingResolution Minerals ASX:RMLHorse Heaven (Golden Gate) · Idaho, USAInitial tungsten assays ('shortly') and remaining gold assaysAuSbWAg

Timing as stated: coming weeks

  • Program 42-hole diamond program at Golden Gate
  • Metres 12,236 m done
  • Assays pending 36 holes (quarterly also cites 32)
  • Stage discovery
  • Context Funding runway ~0.2 quarters; 2027 programs being permitted

Log

Source: Quarterly Activities and Cashflow Report 30 September 2026 · Oct 29, 2026

NovAssays pendingTarga Exploration (operator Kenorland) CSE:TEXOpinaca · Quebec (James Bay), CanadaAssay resultsAu

Timing as stated: fall 2026

  • Program 4,500-5,000 m diamond, 12-15 holes, ~4-5 weeks from late Aug
  • Metres 5,000 m planned
  • Assays pending 12-15 holes / ~4,500-5,000 m (completion expected early Sept)
  • Stage discovery
  • Context 2025 hit 13.88 g/t Au over 3.65 m; intrusion-hosted system over 4 km; Kenorland holds 3% NSR

Log

Source: Targa Exploration Unveils 4,500-5,000m 2026 Drill Program at Opinaca Gold Project · Aug 6, 2026

NovAssays pendingWestern Mines Group ASX:WMGMulga Tank · Minigwal Greenstone Belt, WA, AustraliaUpgraded Mineral Resource Estimate (for Scoping Study)NiCoCuPt

Timing as stated: within a few weeks of 6 Oct 2026

  • Program Phase 4 & 5 RC (32 holes) complete; active seismic survey ~35 km2
  • Metres 2,100 m done
  • Assays pending Two shallow holes MTRC076 and MTRC077
  • Stage resource expansion
  • Context metres_completed is Phase 5 holes MTRC088-094 only; FY2026 total 12,565.9m. Seismic co-funded by EIS.

Log

Source: Final Phase 5 RC Assay Results from Mulga Tank · Oct 6, 2026

Q3DrillingBluelake Mineral NGM:BLUEJoma / Gjersvik (Norway) and Stekenjokk-Levi (Sweden) · Caledonides, Norway/SwedenGjersvik assays, then updated resource and open-pit study; Q3 report; Nov-Dec drilling windowCuZnAg

Timing as stated: Gjersvik assays undated; Q3 report 12 Nov 2026; drilling Nov-Dec 2026 (per Q2 report)

  • Program 20,000-25,000m 2026 program at Joma, Gjersvik, Levi in three windows
  • Metres 25,000 m planned
  • Assays pending Gjersvik: 33 holes (~75% of samples at ALS as of Sept 29)
  • Stage advanced/development
  • Context Phase 1 ~2,000m/9 holes at Joma done in April; ~1,500m/25 holes at Gjersvik from Aug. LNS Holding may invest up to SEK20m. PFS targeted 2027.

Log

Source: Bluelake Mineral slutför borrprogram i Gjersvik · Sep 29, 2026

NovDrillingCanAlaska Uranium TSXV:CVVKey Extension · Saskatchewan, Athabasca Basin, CanadaFall program completion and resultsU

Timing as stated: completion expected late October 2026

  • Program Fall 2026 drill program, 6-10 holes, one rig
  • Assays pending Winter 2026 program assays
  • Stage grassroots
  • Context Targets up-ice of Orchid Lake boulder field and 10+ km western conductive trend.

Log

Source: CanAlaska Begins Fall Drill Program at Key Extension Project · Sep 8, 2026

NovDrillingCapitan Silver TSXV:CAPTCruz de Plata · Durango, MexicoPending assays (more weekly)AgAu

Timing as stated: weekly

  • Program 60,000 m multi-rig 2026 program, four rigs
  • Metres 60,000 m planned
  • Assays pending 80 holes (22 core, 58 RC)
  • Stage discovery
  • Context Drilling Jesus Maria trend to ~500 m depth

Log

Source: Capitan Expands High-Grade Silver Mineralization to 600 Metres Down-Dip and Announces New CRD Discovery at Cruz De Plata · Oct 19, 2026

Q3DrillingFormation Metals CSE:FOMON2 · Quebec (Abitibi, south of Matagami), CanadaMaiden mineral resource estimateAu

Timing as stated: Q3 2026 target (Jun 18 release); not released as of late Oct

  • Program Fully funded 75,000 m 2026 program (per Jun 18, 2026 release)
  • Metres 50,000 m planned
  • Assays pending Not stated
  • Stage resource expansion
  • Context Historic ~871 koz Au estimate (non-compliant); visible gold in step-out hole N2-26-24; ~71,000 m cumulative at N2

Log

Source: Formation Metals Extends A-Zone 200 Metres West of Historic Resource into Previously Undrilled Ground · Jun 18, 2026

H1 ’27DrillingPower Metallic Mines TSXV:PNPNNisk - Lion Zone · James Bay, Quebec, CanadaFurther summer deep-drilling and regional assays; PEA (timing not confirmed in any release read)CuNiPtPd

Timing as stated: 'coming weeks' from 22 Sep 2026; PEA H1 2027 unverified

  • Program Five rigs drilling depth and strike extensions after maiden resource
  • Assays pending PML-26-128 and further deep-extension and regional summer holes
  • Stage resource expansion
  • Context Maiden resource 4.75Mt @ ~3.9% CuEq (>85% Indicated). PEA H1 2027 from 5 Oct 2026 headline only.

Log

Source: Power Metallic extiende Lion en profundidad (hole PML-26-125) · Sep 22, 2026

NovDrillingQ2 Metals TSXV:QTWOCisco · Quebec (James Bay), CanadaPreliminary Economic Assessment (BBA)Li

Timing as stated: Fall 2026; Northern Miner (late Oct 2026) says PEA 'expected soon'

  • Program Summer 2026 infill/exploration diamond drilling, four rigs
  • Metres 9,552 m done of 20,000 m
  • Assays pending Remaining summer/fall holes (hole 93 reported 25 Aug)
  • Stage resource expansion
  • Context Inferred MRE 295 Mt at 1.36% Li2O (Apr 20, 2026); summer drilling aims to convert to Indicated

Log

Source: Q2 Metals drills best hole to date intersecting 403.7 metres at 1.57% Li2O in hole 93 · Aug 25, 2026

NovDrillingVantage Metals ASX:VANKalahari Copper Project (Chanoga PL0773 / Makalamabedi PL2743) · Kalahari Copper Belt, BotswanaAssays from sampled sulphide zones; drilling expands to Makalamabedi (PL2743)CuAg

Timing as stated: 4-6 weeks from 6 Oct 2026; drilling continues to at least end-Nov 2026

  • Program Diamond drilling, 5,000-10,000m program; 6 holes done, CHD007 underway
  • Metres 1,895 m done of 10,000 m
  • Assays pending Lab results for sampled sulphide zones (CHD005R contact intersected, trace chalcopyrite/bornite)
  • Stage discovery
  • Context Planned range 5,000-10,000m per 23 Jul 2026 launch; metres_planned uses top of range. 100% owned.

Log

Source: Drilling Confirms Prospective Copper Contact at the Kalahari Copper Project · Oct 6, 2026

NovPlannedFirst Canadian Graphite TSXV:FCILac Gueret South · Quebec, CanadaPhase III mechanized trenching and diamond drilling at Zone 13 (ATI permit received)C

Timing as stated: fall 2026

  • Program Two-phase EM target follow-up then diamond drilling
  • Stage grassroots
  • Context Phase II stripping depends on ATI permit

Log

Source: First Canadian Graphite gets Quebec permit for Lac Gueret drilling · Oct 27, 2026

NovPlannedGelum Resources CSE:GMRLas Tinajas · Atacama (Maricunga), ChileComplete geophysics (~3 weeks from Oct 20), then drill target selectionAuCu

Timing as stated: survey completion ~Nov 2026; drilling unscheduled

  • Program MT (~3,000m depth) and VIP (~800m) survey by Southern Rock Geophysics; resumed Oct 20 after snow suspension (~50% done); option requires >=4,000m drilling
  • Stage grassroots
  • Context Adjacent to Nuevo Cobre (Rio Tinto-Codelco) ground

Log

Source: Gelum Resources reanuda exploracion geofisica en Las Tinajas · Oct 22, 2026

NovPlannedMogotes Metals TSXV:MOGCopper Cliff · Montana, USAReceipt of drill permits; earliest drill startCu

Timing as stated: earliest November 2026, pending permits

  • Program 8,000-9,000 m planned under Kennecott option
  • Metres 9,000 m planned
  • Stage grassroots
  • Context Option to earn 51% from Kennecott (Rio Tinto) by funding US$16M over three years; metres_planned is top of 8,000-9,000 m range

Log

Source: Mogotes Update on Exploration Plans in 2026-2027 · Sep 22, 2026

NovPlannedMogotes Metals TSXV:MOGFilo Sur (Albor, Cruz del Sur, Cuenca) · Vicuña district, Argentina/ChileDrilling restart at Filo SurCuAu

Timing as stated: 2026-27 season; no restart date given (subject to weather/access)

  • Program Up to 20,000 m over next 12 months
  • Metres 20,000 m planned
  • Stage discovery

Log

Source: Mogotes Update on Exploration Plans in 2026-2027 · Sep 22, 2026

NovCompleteAldebaran Resources TSXV:ALDEAltar · San Juan, ArgentinaUpdated MRE (adds 40,000+ m at main deposit plus ~30,000 m at Porfido Radio); then PFSCuAuAg

Timing as stated: MRE 2026, no date (originally Oct 2026, not yet out); PFS 2027

  • Program 2025-26 infill and geotechnical program
  • Assays pending None flagged; final campaign holes reported Oct 2026
  • Stage advanced/development
  • Context Aldebaran holds 80%

Log

Source: Altar: Aldebaran reporta 1.728 metros de cobre equivalente en San Juan · Oct 6, 2026

NovCompleteATERRA Metals CSE:ATCTotora · Atacama, ChileNI 43-101 technical report filing; Phase II drilling (infill, expansion, met samples) funded by C$8.355M LIFE offeringCuAu

Timing as stated: Technical report within 45 days of Sept 24, 2026 (~Nov 8); Phase II start date not given

  • Program Phase one 3,000 m (2,500 m RC Totora, ~500 m DD Frontera)
  • Metres 3,000 m planned
  • Stage resource expansion

Log

Source: ATERRA Metals Reports Maiden Totora Cu-Au Project · Sep 24, 2026

NovCompleteKoba Resources ASX:KOBMt Garnet / Stannary Hills · Queensland, AustraliaMaiden drilling at Kitchener and Jiminy (Stannary Hills); Gilmore follow-up before year-endSnWCu

Timing as stated: Kitchener/Jiminy drilling 'in coming weeks' from 14 Oct 2026 (earthworks underway); Gilmore infill/extension before end-2026; Stannex follow-up early 2027

  • Program 24-hole maiden program; follow-up at Gilmore
  • Metres 2,937 m done
  • Stage discovery
  • Context Gilmore hole 29 m at 1.2% Sn

Log

Source: Thick, High-Grade Tin Intersected at the Mt Garnet Project · Oct 14, 2026

NovPausedCarnaby Resources ASX:CNBGreater Duchess · Mt Isa, Queensland, AustraliaEvolution Mining scheme of arrangement implementationCuAu

Timing as stated: Shareholders approved Oct 26 (95.42%); second court hearing Oct 29; indicative implementation 10 Nov 2026

  • Program Resource updated to 30.8Mt @ 1.6% CuEq (Aug 2026); FS deferred
  • Stage advanced/development
  • Context Evolution Mining acquiring 100%; Glencore tolling/offtake to be terminated for ~28.6M shares; Evolution to complete updated study post-implementation.

Log

Source: Results of Scheme Meeting · Oct 26, 2026

December 2026 66 programs

Q4Assays pendingATHA Energy TSXV:SASKAngilak (RIB Corridor, Lac 50, KU-Nine Iron) · Nunavut, Angikuni Basin, CanadaRemaining preliminary results; Angikuni MMT 3D inversionU

Timing as stated: results "over the coming weeks"; MMT inversion Q4 2026

  • Program 2026 Angilak program, ~20,000 m, 3 rigs, May-Sept
  • Metres 20,000 m planned
  • Assays pending Core at SRC; reported intervals are radiometric only
  • Stage resource expansion
  • Context RIB North continuity extended to 1.45 km; drilling continued through end Sept 2026. 2027 step-up to 75x75 m delineation if continuity holds.

Log

Source: ATHA Energy extends RIB North uranium continuity to 1.45 kilometers on seven new holes · Sep 9, 2026

DecAssays pendingContango Silver & Gold NYSE American:CTGOKitsault Valley · British Columbia, CanadaKitsault assay releases; MRE update H1 2027AgAu

Timing as stated: next 2-3 months (from Oct 28, 2026)

  • Program 2026 program 56,492 m in 152 holes (vs 40,000 m planned)
  • Metres 56,492 m done of 40,000 m
  • Assays pending 2026 Kitsault assays
  • Stage resource expansion
  • Context Program completed Oct 15, 2026; Initial Assessment later in 2027

Log

Source: Contango Silver & Gold 8-K exhibit 99.1 · Oct 28, 2026

DecAssays pendingCopper Quest Exploration CSE:CQXRip / STARS · British Columbia, CanadaSTARS IP final report and drill targets; Rip assays after ArcWest negotiationsCuMo

Timing as stated: No timing given

  • Program Rip phase 2: 5 holes, 1,654 m complete; STARS: 20 km2 3D IP survey complete
  • Metres 1,654 m done of 2,000 m
  • Assays pending All 5 Rip holes; assaying on hold until ArcWest option renegotiation concludes
  • Stage discovery
  • Context Rip optioned from ArcWest Exploration

Log

Source: Copper Quest Provides 2026 Exploration Update · Sep 2, 2026

DecAssays pendingEvergold Corp. TSXV:EVERGolden Lion (GL1) · BC (Toodoggone), CanadaRemaining hole results; area-based permit application for IP and drillingAuAg

Timing as stated: as received; permit over coming months

  • Program 16 diamond holes, 3,988 m, Jul-Aug 2026
  • Metres 3,988 m done
  • Assays pending 10 of 16 holes, plus ICP and rock/soil samples
  • Stage discovery
  • Context GL26-031: 13.5 m @ 2.84 g/t Au and 127.65 g/t Ag

Log

Source: Evergold Drills 4.9 m of 7.70 g/t Au and 186.0 g/t Ag in First 2026 Drill Holes at Golden Lion · Oct 2, 2026

DecAssays pendingGold Strike Resources TSXV:GSRFlorin · Yukon, CanadaHole-by-hole assays; geophysics interpretationAu

Timing as stated: unspecified

  • Program >8,000 m diamond planned, 2 rigs; 11 holes completed (completion ~Sept 24)
  • Metres 8,000 m planned
  • Assays pending Most of 11 holes (first hole reported Oct 22: 400 m @ 0.53 g/t)
  • Stage resource expansion
  • Context 2.507 Moz pit-constrained inferred resource open in all directions; new 5-yr permit up to 60,000 m

Log

Source: Gold Strike Announces Commencement of Drilling at Florin Gold Project, Yukon · Jul 9, 2026

DecAssays pendingGoliath Resources TSXV:GOTGolddigger (Surebet discovery) · BC (Golden Triangle), CanadaAssay batches from 83 pending holes; updated wireframes; 2027 drill planAuAgCu

Timing as stated: through end-2026, possibly into 2027

  • Program 2026 Golddigger season: 48,443 m in 97 holes drilled
  • Metres 48,443 m done of 50,000 m
  • Assays pending 83 of 97 holes
  • Stage discovery
  • Context GD-26-418: 8.09 g/t AuEq over 16 m

Log

Source: Goliath Wraps 48,443 Metre Drill Program at Surebet, Expands Footprint to 2.01 Square Kilometres · Sep 22, 2026

DecAssays pendingMagnum Mining and Exploration ASX:MGUAzimuth (Piracanjuba North) / Palmares · Goias, BrazilMaiden JORC Mineral Resource Estimate (Plateau) by GE21; Scoping Study to follow if data supportsREE

Timing as stated: end-November 2026; may slip up to two weeks on lab delays

  • Program ~10,314 m across 867 collars at Piracanjuba (7,137 m on Plateau) complete; further ~2,000 m diamond infill phase planned
  • Metres 10,314 m done of 10,000 m
  • Assays pending Lab results feeding Plateau MRE (turnaround ~double normal); no Palmares results in release
  • Stage discovery
  • Context Ionic clay REE target; figures from FilingReader summary of ASX filing

Log

Source: Magnum completes 10,000m Piracanjuba drilling milestone and shifts focus to Plateau resource definition · Sep 18, 2026

Q4Assays pendingNexGold Mining TSXV:NEXGGoldboro · Nova Scotia, CanadaUpdated feasibility study; potential final investment decision (no date)Au

Timing as stated: FS by end Q4 2026

  • Program 40,000 m RC infill (raised from 30,000 m), >76% complete by Aug 19
  • Metres 40,000 m done of 40,000 m
  • Assays pending Results released for 239 holes/10,276 m; remainder not yet reported
  • Stage advanced/development
  • Context RC infill may upgrade Indicated to Measured; MRE update to follow FS; 5.26 g/t over 7 m reported Aug 19

Log

Source: NexGold Reports Progress on Development Activities at the Goldboro Gold Project in Nova Scotia · Oct 27, 2026

DecAssays pendingPurepoint Uranium / IsoEnergy TSXV:PTUDorado JV (Nova target) · Saskatchewan, Athabasca Basin, CanadaSummer drill resultsU

Timing as stated: no date given; summer drilling demobilised September 2026; assays to feed 2027 planning

  • Program Summer 2026 drill program
  • Assays pending Summer 2026 results being compiled
  • Stage discovery
  • Context Winter: NV26-05 returned 0.3 m at 1.65% U3O8; mineralization in 9 winter holes.

Log

Source: Purepoint Intersects 7.4 Metres Averaging 8,760 CPS at the Unconformity in First Drill Hole at Q24, Dorado Project · Sep 17, 2026

DecAssays pendingU.S. GoldMining NASDAQ:USGOWhistler · Alaska, USAInitial assay resultsAuCu

Timing as stated: coming weeks through end of 2026

  • Program 2026 program complete: 17 core holes across 10 targets
  • Metres 7,493 m done
  • Assays pending All 2026 holes
  • Stage resource expansion

Log

Source: U.S. GoldMining Completes 2026 Drill Program at Whistler · Sep 22, 2026

DecAssays pendingWhite Gold Corp. TSXV:WGOWhite Gold (Golden Saddle, VG, Ryan's Surprise, Arc) · Yukon (White Gold District), CanadaRemaining 2026 assays; updated resource (VG down-plunge extension 310 m to 430 m possible)Au

Timing as stated: unspecified

  • Program 15,000-20,000 m diamond, 3 rigs, 2026 season (started May 28)
  • Metres 20,000 m planned
  • Assays pending 49 holes, incl. Golden Saddle 2.0 and VG East discovery targets
  • Stage resource expansion
  • Context First 2026 results Oct 20: 38.08 m @ 1.47 g/t Au at Golden Saddle; Sept 2026 PEA: 188 koz/yr, after-tax NPV C$1.86B, 41% IRR

Log

Source: White Gold expands two Yukon deposits · Oct 23, 2026

DecDrillingAllied Critical Metals CSE:ACMBorralha · Northern Portugal, PortugalFurther Santa Helena/Venise assays; resource updateW

Timing as stated: as received; MRE undated

  • Program ~20,000 m core and RC program
  • Metres 20,000 m planned
  • Stage resource expansion
  • Context Step-out/infill to expand MRE; PEA was targeted Q1 2026

Log

Source: Allied Critical Metals Launches 20,000 Meter 2026 Drill Program at Borralha · Jan 26, 2026

Q3DrillingAlligator Energy ASX:AGEBig Lake · South Australia, Lake Eyre Basin, AustraliaFurther Site 10 drilling and strat fences; exploration target estimateU

Timing as stated: drilling Q3-Q4 2026; exploration target 2027

  • Program Aircore drilling, roll-front targeting
  • Metres 4,112 m done
  • Stage grassroots
  • Context 33 aircore holes; grades from downhole gamma; follow-up at Site 10 needs SA EPEPR approval.

Log

Source: Further Uranium Mineralisation Intersected at Big Lake as RollFront Model Strengthens · Aug 24, 2026

DecDrillingAlma Metals ASX:ALMBriggs Copper Project · Queensland, AustraliaComplete 2026 infill, interim MRE updateCuMo

Timing as stated: end-2026

  • Program 41 high-priority infill holes (~12,500m) by end-2026 plus 4 exploration holes (~1,250m)
  • Metres 2,300 m done of 12,500 m
  • Assays pending Four completed holes plus remaining program
  • Stage resource expansion
  • Context Earn-in JV with Canterbury Resources (ASX:CBY); Alma 51% committed to 70%. Further infill H1 2027 for updated MRE and PFS; 35 holes ~17,500m planned 2027.

Log

Source: First Assays from 2026 Infill Drilling at Briggs · Aug 4, 2026

DecDrillingAmaroq LSE:AMRQIlua · South Greenland (Gardar), GreenlandInitial Ilua scout drill resultsREE

Timing as stated: before year-end 2026

  • Program Scout drilling of three initial targets on 5 km+ zone
  • Metres 699 m done
  • Stage grassroots
  • Context Pegmatite-hosted REE; first drilling at Ilua

Log

Source: Amaroq Q2 2026 results · Aug 13, 2026

DecDrillingArras Minerals TSXV:ARKElemes (Berezski, Aimandai) · Pavlodar, KazakhstanCompletion of 30,000m programCuAu

Timing as stated: end of 2026

  • Program Phase 2 diamond drilling to 30,000m total plus 6,000m KGK top-of-bedrock; rigs doubled to four
  • Metres 30,000 m planned
  • Stage discovery
  • Context No current resource; Teck strategic alliance ended (per minexasia headline).

Log

Source: Arras Minerals outlines 2026 Elemes exploration plan, doubles drill rigs to four in Q1 2026 · Jan 22, 2026

Q4DrillingAtlas Critical Minerals NASDAQ:ATCXGraphite Project · Minas Gerais, BrazilMaiden Mineral Resource Estimate (SGS Canada)C

Timing as stated: Q4 2026

  • Program ~6,000 m across three tenements; 20 holes done on first
  • Metres 2,300 m done of 6,000 m
  • Assays pending Remaining tenements' drilling and assays
  • Stage discovery
  • Context PEA planned Q1 2027

Log

Source: Atlas Critical Minerals Intersects High-Grade Graphite in All 20 Drill Holes · Jul 21, 2026

H1 ’28DrillingAurum Resources ASX:AUEBoundiali · Savanes, Côte d'IvoireDFS with updated ore reserve; then mining licences and FIDAu

Timing as stated: DFS later in 2026; first gold targeted H1 2028

  • Program CY2026 diamond drilling, company-owned rigs (Business News 28 Oct 2026 cites a 150,000 m program; earlier sources 100,000 m)
  • Metres 100,000 m planned
  • Stage advanced/development
  • Context Drilling cut-off end Sept 2026; construction start targeted early 2027

Log

Source: Aurum powers past 3.8Moz gold at West African flagship · Oct 28, 2026

H2DrillingAusQuest ASX:AQDCangallo · southern Peru, PeruStage 3 diamond results; Stage 4 permits and drilling of southern/eastern extensionsCuAu

Timing as stated: Diamond drilling to continue several months into FY2027; ~20 Stage 4 pads expected in H2 CY2026

  • Program Stage 3: 54 RC holes (~21,600 m) complete and reported; Stage 3 diamond drilling in progress; Stage 4 (>50,000 m) being permitted
  • Metres 24,500 m done
  • Assays pending Stage 3 diamond holes
  • Stage discovery
  • Context System extends >1 km N-S

Log

Source: AusQuest Annual Report 30 June 2026 · Sep 21, 2026

Q4DrillingBanyan Gold TSXV:BYNAurMac (Powerline, Airstrip) · Yukon (Mayo), CanadaMaiden PEAAu

Timing as stated: Q4 2026 (company release)

  • Program 2026 program ~70,000m (60,000m AurMac deposit refinement + 10,000m regional); started Feb 2026
  • Metres 70,000 m planned
  • Assays pending Not stated
  • Stage resource expansion
  • Context AX-26-874: 13.03 g/t Au over 14.2 m at Powerline North; MRE 2.27 Moz Ind + 5.45 Moz Inf; PEA timing from Crux Investor headline, not the release

Log

Source: Banyan Gold Advances AurMac Toward a PEA with Engagement of Leading Mining Consultants, Yukon, Canada · Jul 7, 2026

DecDrillingBTU Metals (Kinross operator) TSXV:BTUDixie Halo · Ontario (Red Lake), CanadaPhase 1 results guiding Phase 2; Kinross earning 70%AuCu

Timing as stated: 2026

  • Program 6,000-8,000 m in 2 phases; Phase 1 ~3,000-4,000 m, ~8 holes from ~Feb 20
  • Metres 8,000 m planned
  • Assays pending Not stated
  • Stage grassroots
  • Context Adjacent to Kinross' Great Bear; Phase 2 targets Limb/Arrow stratigraphy

Log

Source: Kinross to Initiate Two Phase 6,000-8,000 Metre Drill Program on BTU Dixie Halo Property · Feb 12, 2026

DecDrillingCabral Gold TSXV:CBRCuiú Cuiú · Pará (Tapajós), BrazilNI 43-101 resource updateAu

Timing as stated: year-end 2026

  • Program Diamond and RC drilling at Central, Jerimum Cima, Machichie, Mutum
  • Assays pending 28 diamond + 69 RC holes
  • Stage producer exploration
  • Context Commercial heap-leach production targeted Q4 2026; lab delays

Log

Source: Cabral Gold extends Central deposit mineralization ahead of its year-end resource update · Oct 20, 2026

DecDrillingCanAlaska Uranium / Cameco TSXV:CVVWest McArthur JV (Pike Zone, C10S corridor) · Saskatchewan, Athabasca Basin, CanadaSummer drill resultsU

Timing as stated: summer drilling expected complete September 2026

  • Program C$15M 2026 program; summer 3-rig drilling
  • Stage discovery
  • Context Summer: 20-25 unconformity intersections planned. Winter: 10 of 24 tests mineralized; WMA101-02 5.4 m at 1.48% U3O8; system over 1.3 km strike.

Log

Source: CanAlaska Announces Assay Results from Winter Drill Program on West McArthur Project · Aug 17, 2026

DecDrillingCauldron Energy ASX:CXUYanrey (Manyingee North/South, Bennett Well) · Western Australia, AustraliaFormal resource updateU

Timing as stated: "later this year" (2026)

  • Program Resource extension drilling
  • Stage resource expansion
  • Context 55 Mlb JORC resource; WA uranium mining ban remains.

Log

Source: Cauldron Energy's 100% drilling success rate extending uranium resource polygons · Sep 4, 2026

Q4DrillingContango Silver & Gold NYSE American:CTGOLucky Shot (KM vein) · Alaska, USAKM vein assay results; updated MRE in H1 2027Au

Timing as stated: Q4 2026

  • Program Underground KM vein drilling, 17 holes; surface program done (~5,800 m)
  • Metres 1,140 m planned
  • Assays pending KM vein holes; LSS26031 visible-gold interval; LSS26025
  • Stage advanced/development
  • Context Underground development 450 of 830 m done, completion mid-Q4 2026

Log

Source: Contango Intersects 140.23 g/t Gold over 0.63 Meters ... at Lucky Shot and Advances KM Vein Drilling · Oct 6, 2026

DecDrillingDeep Yellow ASX:DYLAlligator River (King River Camp) · Northern Territory, AustraliaDrill resultsU

Timing as stated: campaign starting August 2026

  • Program 2026 drilling campaign
  • Stage grassroots
  • Context Tumas (Namibia) FID targeted Q4 2026.

Log

Source: Deep Yellow Progresses Tumas Uranium Project with Key Construction Contracts and Targets Q4 2026 Investment Decision · Jul 28, 2026

Q3DrillingDenison Mines TSX:DMLWheeler River (Phoenix North, K-West, RE/RW; Gryphon) · Saskatchewan, Athabasca Basin, CanadaSummer exploration resultsU

Timing as stated: program scheduled through end of Q3 2026

  • Program Summer 2026 exploration drilling + Gryphon delineation/exploration
  • Metres 1,300 m done of 5,000 m
  • Stage advanced/development
  • Context ~1,300 m in two holes done at end Q2; Gryphon exploration program planned Q3 2026; Gryphon evaluation work deferred to 2027. 2026 exploration outlook raised to C$27.8M.

Log

Source: Denison Mines Q2 2026 MD&A (Form 6-K) · Aug 12, 2026

DecDrillingElement 29 Resources TSXV:ECUElida · Lima-Ancash, PeruUpdated resource estimateCuMo

Timing as stated: year-end 2026 per Mining Reporters; company releases (Jul 23, Jul 28) give no MRE date

  • Program 10,000 m two-rig program
  • Metres 4,886 m done of 10,000 m
  • Stage resource expansion
  • Context ELID035 returned 1,534.6 m interval; seeking approval for up to 60 more platforms

Log

Source: Element 29 Receives Upgraded Five-Year Drill Permit Supporting Advancement of the Elida Porphyry Cu-Mo-Ag Project, Peru · Jul 28, 2026

DecDrillingFireFox Gold TSXV:FFOXMustajärvi · Lapland, FinlandFurther East/Lammas zone results; maiden Mustajarvi MREAu

Timing as stated: MRE no date given; 2027 program planned

  • Program Expanded 2026 diamond program, 2 rigs
  • Metres 9,992 m done of 10,000 m
  • Assays pending Not stated
  • Stage discovery
  • Context Project total 25,744 m; ~9,992 m derived from company figures; follow-up drilling at Sarvi

Log

Source: FireFox Gold Drills Downdip Extension of East Zone · Sep 1, 2026

Q4DrillingFitzroy Minerals TSXV:FTZBuen Retiro (Tenorita) · Atacama, ChileMaiden MRE and PEA (Tenorita, Nativo, Ortuzar); DIA environmental submission; then PFSCu

Timing as stated: MRE/PEA and DIA Q4 2026; PFS with maiden reserve Q2 2027

  • Program Three rigs; ~4,000 m more planned for rest of 2026; drilling focused on M&I definition at Tenorita
  • Metres 25,477 m done of 9,000 m
  • Assays pending BRT-DDH101 (geotech) only flagged
  • Stage resource expansion
  • Context Production targeted early 2028

Log

Source: Fitzroy Minerals Reports 30.5 Metres of 2.48% Cu from Surface and Provides an Update for its Advanced Buen Retiro Copper Project, Chile · Oct 5, 2026

H2DrillingGolden Horse Minerals ASX:GHMSouthern Cross (Hopes Hill) · WA (Yilgarn), AustraliaInaugural Hopes Hill Mineral Resource EstimateAu

Timing as stated: H2 CY2026

  • Program RC and diamond drilling, 2 DD + 1 RC rig at Hopes Hill
  • Metres 50,000 m done
  • Assays pending Substantial Hopes Hill backlog
  • Stage discovery
  • Context >50,000 m drilled in H1 CY2026; system >3 km strike

Log

Source: Golden Horse Minerals Quarterly Activities Report June 2026 · Jul 21, 2026

DecDrillingGroup Eleven Resources TSXV:ZNGBallywire / Stonepark (PG West) · Limerick, Irish Midlands, IrelandPossible fifth rig; first holes into PallasGreen look-alike target and untested gravity anomaliesZnPbAgCu

Timing as stated: later this year (2026)

  • Program ~70,000m campaign (35-40% in 2026); ~30,000m/91 holes drilled at Ballywire; 4 rigs
  • Metres 30,000 m done of 70,000 m
  • Stage discovery
  • Context Glencore holds 12.8% (no JV). Maiden MRE targeted within 12-18 months per 29 Jun 2026 Crux article.

Log

Source: Group Eleven puts copper first at Ireland's Ballywire discovery · Oct 21, 2026

Q4DrillingGunnison Copper TSX:GCUGunnison / Strong & Harris · Arizona, USAPreliminary resultsCu

Timing as stated: Q4 2026; full results mid-2027

  • Program Up to 120 holes (~42,000 m): metallurgical, resource expansion/conversion and exploration
  • Metres 2,420 m done of 42,000 m
  • Stage advanced/development
  • Context Rigs expanding from two to six in Sept 2026; Nuton (Rio Tinto) funds Johnson Camp

Log

Source: Gunnison Copper news release (Form 40-F exhibit) · Aug 17, 2026

H2DrillingHeliostar Metals TSX:HSTRLa Colorada / San Agustin · Sonora / Durango, MexicoLa Colorada underground drill programAu

Timing as stated: H2 2026 per Jan 13 release; not mentioned in Aug 6 Q2 MD&A

  • Program San Agustin 2026 resource/reserve drilling raised to 15,000-18,000 m with second rig; La Colorada Veta Madre pit-expansion drilling 44 holes/8,425 m done in Q2; La Colorada UG program planned
  • Metres 18,000 m planned
  • Stage producer exploration

Log

Source: Heliostar Q2 2026 MD&A · Aug 6, 2026

DecDrillingHot Chili ASX:HCHCosta Fuego (La Verde discovery) · Atacama, ChileMaiden La Verde mineral resource estimateCuAu

Timing as stated: later in calendar 2026

  • Program La Verde drilling with three rigs; ~30,000 m complete as of July 2026
  • Metres 30,000 m done
  • Assays pending 21 holes pending as of June quarter
  • Stage resource expansion
  • Context Revised PFS underway; Costa Fuego EIA submission targeted Q2 2027; strategic partnering process (BMO)

Log

Source: Hot Chili Annual Report 2026 · Sep 29, 2026

DecDrillingKoryx Copper TSXV:KRYLuanshya West / Mpongwe · Zambian Copperbelt, ZambiaCompletion of Luanshya West drilling; Mpongwe soil sampling resultsCu

Timing as stated: Luanshya West completion by mid-Dec 2026; Mpongwe sampling done early Nov 2026

  • Program Maiden 2,500m inclined diamond drilling testing 3-4 targets at Luanshya West; ~3,000 soil samples at Mpongwe
  • Metres 2,500 m planned
  • Stage grassroots
  • Context Drilling to start before end-Sep 2026; Haib (Namibia) remains primary focus. Mpongwe follow-up drilling may slip to 2027 with rainy season.

Log

Source: Koryx announces maiden drill programme on Zambia projects · Sep 18, 2026

H2DrillingKuya Silver CSE:KUYABethania · Huancavelica, PeruBethania underground and initial surface drill resultsAg

Timing as stated: H2 2026 (per Mar 17 release)

  • Program Expanded 2026 program to ~20,000m (~10,000m underground, ~10,000m surface)
  • Metres 20,000 m planned
  • Stage resource expansion
  • Context Fully funded; resource expansion focus

Log

Source: Kuya Silver Expands Fully Funded 2026 Drill Program at the Bethania Project to a Record 20,000 Metres · Mar 17, 2026

DecDrillingNordic Resources ASX:NNLPulju (Ni-Cu) / Kopsa (Au-Cu) · Central Lapland / Ostrobothnia, FinlandMetallurgical test resultsNiCuAu

Timing as stated: later in 2026

  • Program Drilling resumed Aug 2026; Ionic Leach survey at Pulju; metallurgical testing
  • Stage resource expansion
  • Context Final 2026 Kopsa/Kiimala assays reported in June quarter.

Log

Source: Quarterly Activities Report & Appendix 5B · Jul 30, 2026

DecDrillingOnyx Gold TSXV:ONYXMunro-Croesus · Ontario (Timmins/Abitibi), CanadaDrill result batches; 900 line-km drone mag surveyAu

Timing as stated: through year-end 2026

  • Program Expanded to 110,000 m, 4 rigs, through year-end 2026
  • Metres 50,000 m done of 110,000 m
  • Assays pending Batches pending (135 holes drilled vs 77 reported as of Apr 22)
  • Stage resource expansion
  • Context Year-round drilling

Log

Source: Onyx Gold Expands Munro-Croesus Drill Program to 110,000 Meters; Adds Fourth Drill Rig · Apr 23, 2026

DecDrillingPilbara Gold (ex-Kairos) ASX:PGLMt York · WA (Pilbara), AustraliaUpdated Mt York Mineral Resource EstimateAu

Timing as stated: later in 2026

  • Program 50,000 m RC/diamond program, 5-6 rigs
  • Metres 13,000 m done of 50,000 m
  • Assays pending All current program assays (~8-week lab turnaround)
  • Stage resource expansion
  • Context PFS targeted Q2 CY2027 (also stated Q1 2027); 2.1 Moz resource

Log

Source: Pilbara Gold Quarterly Activities Report June 2026 · Jul 20, 2026

DecDrillingSable Resources TSXV:SAEZorro / El Fierro · San Juan, ArgentinaFirst Zorro drill resultsCuAuMo

Timing as stated: not specified

  • Program Maiden diamond drill program at Zorro (size not disclosed)
  • Assays pending El Fierro late-2025 holes
  • Stage grassroots

Log

Source: Sable Commences Maiden Drill Program at the Zorro Project, San Juan, Argentina · Aug 5, 2026

DecDrillingStallion Uranium TSXV:STUDCoyote target / Stone Island · Saskatchewan, Athabasca Basin, CanadaExpanded program completion and resultsU

Timing as stated: before end of 2026 exploration season

  • Program Coyote drill program expanded
  • Metres 4,626 m done of 6,750 m
  • Stage grassroots
  • Context Expanded from 5,500 m; peak 1,416 cps in ML26-005; gravity survey at Stone Island.

Log

Source: Stallion Uranium Expands Coyote Drill Program After Highest Radioactivity Reading · Aug 13, 2026

DecDrillingSunshine Silver Mining & Refining NYSE:SSMRSunshine Mine · Idaho (Silver Valley), USACompletion of 50,000 m infill program and additional drill results; feasibility study Q2 2027Ag

Timing as stated: drill results before year-end 2026

  • Program ~50,000 m underground infill program, three rigs
  • Metres 47,600 m done of 50,000 m
  • Stage advanced/development
  • Context Resource upgrade in 2027 feasibility study; production restart targeted late 2028

Log

Source: Sunshine Silver Mining & Refining Advances Operational Readiness at the Sunshine Mine · Oct 19, 2026

DecDrillingSuper Copper CSE:CUPRCordillera · Atacama, ChileFirst drill assaysCu

Timing as stated: 'through the balance of 2026'

  • Program Phase 1: up to 15 diamond holes (~5,000 m) at El Alto target
  • Metres 2,348 m done of 5,000 m
  • Assays pending First three holes at lab or in prep (DH26CC-001 to -003)
  • Stage discovery
  • Context Possible follow-on drilling at Castilla

Log

Source: Super Copper Cordillera Cobre drilling update (Guía Minera) · Oct 7, 2026

DecDrillingThor Explorations TSXV:THXDouta · Kédougou, SenegalUpdated Douta Mineral Resource Estimate for optimised PFSAu

Timing as stated: by year-end 2026

  • Program 40,000 m RC/air-core program
  • Metres 15,000 m done of 40,000 m
  • Stage advanced/development
  • Context Metres completed = >15,000 m in Q2 only; FID targeted Q3 2026

Log

Source: Thor Explorations Announces Q2 2026 Operating Update · Jul 16, 2026

Q4DrillingThor Explorations TSXV:THXSegilola · Osun State, NigeriaFurther Segilola below-pit drill results; updated resource estimateAu

Timing as stated: results 'in the current period' (Q4 2026); resource targeted by end-2026

  • Program Underground resource and near-mine drilling
  • Metres 10,000 m done
  • Assays pending Ongoing underground drilling (four rigs)
  • Stage producer exploration
  • Context >10,000 m drilled in Q2 2026

Log

Source: Further Mineralisation Intersected Below Segilola · Aug 6, 2026

DecDrillingTroilus Mining TSX:TLGTroilus (Z87, West Rim, J) · Quebec (Frotet-Evans belt), CanadaGeological model updateAuCuAg

Timing as stated: 2026 (no dates)

  • Program ~40,000 m 2026 near-mine and regional drilling
  • Metres 40,000 m planned
  • Assays pending None stated in Aug 20 release
  • Stage advanced/development
  • Context Z87 extension: 8.84 g/t AuEq over 4.8 m ~300 m beyond resource; 40,000 m per Mar 31 release

Log

Source: Troilus Drills 8.84 g/t AuEq over 4.8 m at Z87 · Aug 20, 2026

Q4DrillingWA1 Resources ASX:WA1Luni · Western Australia, AustraliaPre-Feasibility StudyNb

Timing as stated: Q4 CY2026

  • Program Drilling to define Measured resource in eastern zone
  • Stage advanced/development
  • Context 2026 MRE 220 Mt at 1.0% Nb2O5 incl. 93 Mt Indicated at 1.32%

Log

Source: WA1 Resources Unveils Luni Niobium Project Highlights at 2026 Diggers & Dealers Forum · Aug 5, 2026

Q4PlannedAurum Resources ASX:AUENapié (Tchaga) · Northern Côte d'Ivoire, Côte d'IvoireStart of 30,000 m Napié programAu

Timing as stated: Q4 CY2026

  • Program 30,000 m drill program
  • Metres 30,000 m planned
  • Stage resource expansion
  • Context Part of 130,000 m / 16-rig CY2026 group plan

Log

Source: Aurum Resources Boundiali drilling update · Sep 18, 2026

H2PlannedCanterra Minerals TSXV:CTMWilding Gold · Newfoundland (central), CanadaWilding diamond drill resultsAu

Timing as stated: H2 2026 drilling; results through 2026

  • Program ~5,000 m follow-up diamond drilling summer/fall plus ~250 percussion holes (part of 15,000 m company program)
  • Metres 5,000 m planned
  • Assays pending Not stated
  • Stage discovery
  • Context Till/top-of-bedrock percussion sampling to define bedrock targets; company also drilling Buchans VMS

Log

Source: Canterra Launches Fully Funded 15,000 Metre Discovery-Focused Drill Program in Newfoundland · Feb 18, 2026

DecPlannedClean Air Metals TSXV:AIRThunder Bay North (Escape, Current) · Thunder Bay, Ontario, CanadaMT survey and follow-up drilling; Advanced Exploration permittingPtPdCuNi

Timing as stated: 2026 (no dates given)

  • Program MT survey then follow-up drilling along 2.5km Escape down-plunge
  • Stage advanced/development
  • Context PEA Oct 2025; seeking strategic partners.

Log

Source: Clean Air Metals Announces 2026 Strategic Objectives in Historically Strong PGE and Copper Markets · Jan 12, 2026

Q3PlannedDenison Mines / Skyharbour Resources TSX:DML; TSXV:SYHWheeler North JV (Sphinx, Fork, Grayling) · Saskatchewan, Athabasca Basin, CanadaFall program start/resultsU

Timing as stated: starting Q3 2026

  • Program Fall 2026 drill program (Denison operator)
  • Metres 5,500 m planned
  • Stage grassroots

Log

Source: Denison Mines Q2 2026 MD&A (Form 6-K) · Aug 12, 2026

DecPlannedHamelin Gold ASX:HMGDay Dawn / Venus · WA (Paterson / Yilgarn), AustraliaVenus aircore drilling (delayed by cyclone rain)Au

Timing as stated: second half/late 2026

  • Program Day Dawn Phase 2 RC (~3,000 m) + EIS diamond; Venus ~130-hole aircore
  • Metres 3,000 m planned
  • Assays pending 13 Phase 1 Day Dawn RC holes
  • Stage discovery
  • Context Phase 2 RC slated Aug 2026, diamond Sept 2026

Log

Source: Hamelin Gold Quarterly Activities Report June 2026 · Jul 30, 2026

DecPlannedKalgoorlie Gold Mining ASX:KALPinjin · WA (Laverton Tectonic Zone), AustraliaDeeper RC drilling beneath LTZ Flexure gold anomalies and first-pass Rebecca Sequence aircoreAu

Timing as stated: work scheduled mid-October 2026 (rain-closed roads may delay start); results thereafter

  • Program Kirgella Gift-Providence RC (21 holes, 3,702 m) and Lighthorse RC (19 holes, 3,194 m) reported; LTZ Flexure aircore (225 holes, 7,212 m) reported; next: deeper RC at Flexure plus Rebecca Sequence aircore
  • Metres 14,108 m done of 10,750 m
  • Assays pending 21 Kirgella Gift-Providence RC holes; LTZ Flexure aircore
  • Stage discovery
  • Context Long lab turnaround cited

Log

Source: KalGold lights up 2km WA gold trail at Pinjin · Oct 5, 2026

DecPlannedKincora Copper ASX:KCCNyngan West / Fairholme / Cowal East / Trundle · Lachlan Fold Belt, NSW, AustraliaNyngan West drilling completion; Fairholme start after Christmas break; Cowal East gravity survey NovCuAu

Timing as stated: Nyngan West before year end 2026

  • Program 340 air-core holes, >25,000m across 17 targets (sole funded up to A$3m)
  • Metres 25,000 m planned
  • Stage grassroots
  • Context AngloGold Ashanti funding separate drilling at Nyngan; Kincora running partner process for other assets.

Log

Source: Kincora Announces Exploration Strategy Update: Drilling Planned Across Four Projects · Sep 3, 2026

DecPlannedKobrea Exploration CSE:KBXWestern Malargüe (El Destino) · Mendoza, ArgentinaStart of 2026/27 field season incl. first diamond drilling at El DestinoCuAuMo

Timing as stated: 2026/2027 season

  • Program US$4M 2026/27 program: diamond drilling and IP at El Destino, IP at KBX-17, mapping and sampling
  • Stage grassroots
  • Context Funded by BHP under exploration alliance; BHP can earn 75% of up to four projects by spending US$40M each over eight years

Log

Source: Kobrea 2026/2027 exploration program approved (BHP alliance) · Sep 30, 2026

Q3PlannedMundoro Capital TSXV:MUNVitanovac (South Timok Corridor) · Timok Magmatic Complex, SerbiaSite mobilisation for Vitanovac holeCuAu

Timing as stated: Mobilisation Q3 2026; CEO says drill testing expected 'in the coming quarter' (Q4 2026)

  • Program One additional drill hole planned (BHP option)
  • Stage grassroots
  • Context BHP under 2023 option agreement covering Borsko, Trstenik and South Timok; AMT/gravity data modelling slated H2 2026.

Log

Source: Mundoro Q2 2026 results and exploration update · Aug 31, 2026

DecPlannedNoronex ASX:NRXHumpback-Damara / Fortuna / Rosy Copper (Namibia) and Cgae Cgae (Botswana) · Kalahari Copper Belt, Namibia/BotswanaDecember-quarter drilling at Fortuna, Rosy Copper, Humpback South and Cgae CgaeCuAg

Timing as stated: October-December 2026

  • Program 2,500m Namibia + 500m Cgae Cgae drilling (South32 earn-in)
  • Metres 3,000 m planned
  • Stage discovery
  • Context South32 earn-in: A$15m for 60% (Namibia), A$5m for 60% (Botswana); report also cites a 3,000m South32 program from Oct 2026 plus 700m in Botswana (figures inconsistent). Powerline 7,112m RC fully assayed.

Log

Source: Quarterly Report - June 2026 · Jul 24, 2026

DecPlannedONGold Resources TSXV:ONAUTPK (Gold Ridge, West Discovery) · Ontario (northern), CanadaPhase 2 drill resultsAu

Timing as stated: late 2026

  • Program Phase 2 diamond drilling, Aug/Sept 2026 (metres not stated)
  • Assays pending Not stated
  • Stage discovery
  • Context 2025 program: 9 holes, 2,169 m

Log

Source: ONGold Kicks Off 2026 Exploration Season at Northern Ontario Gold Project · May 20, 2026

DecPlannedOrvana Minerals TSX:ORVTaguas · San Juan, ArgentinaStart of FY2027 Taguas program incl. TADD-279 extensionAuCu

Timing as stated: late 2026 to early 2027; subject to permitting/funding

  • Program FY2027 program (preliminary): ~19,500m (~10,000m oxide infill at Cerro Taguas + ~9,500m deep porphyry), MT/IP to >1.5km, ~US$15M; TADD-279 (842m, cased) to be extended
  • Metres 19,500 m planned
  • Stage discovery
  • Context 205 m at 0.25 g/t Au and 0.12% Cu from 715 m

Log

Source: Orvana Announces New Strategic Three-Tiered Exploration Program for Its Taguas Project in Argentina · Sep 21, 2026

DecPlannedRenegade Gold TSXV:RAGEBelanger / BobJo / LP-Uchi (Confederation Belt) · Ontario (Red Lake), CanadaField result interpretation; targets advanced to drill-readyAu

Timing as stated: through the fall

  • Program Surface programs (till, soil, channel); drill targeting
  • Assays pending 884 soil/till + 7 rock (LP-Uchi); 336 samples (BobJo)
  • Stage grassroots
  • Context Visible gold in outcrop at Belanger, ~71 km east of Red Lake

Log

Source: Renegade Gold exploration update · Oct 5, 2026

Q4PlannedSurge Battery Metals TSXV:NILINevada North · Nevada, USAPreliminary Feasibility StudyLi

Timing as stated: Q4 2026

  • Program 2026 drill program supporting feasibility work
  • Stage advanced/development
  • Context Mobilization targeted Sept 2026, continuing into 2027 season; updated MRE filed June 30, 2026

Log

Source: Surge Battery Metals Announces 2026 Drill Program to Accelerate Nevada North Bankable Feasibility Study · Aug 19, 2026

DecPlannedVicuña Corp (BHP / Lundin Mining JV)Filo del Sol (Vicuña district) · San Juan, ArgentinaFull resumption of drilling as seasonal thaw allowsCuAuAg

Timing as stated: 2026-2027 season

  • Program 2026-27 season diamond drilling campaign (Boart Longyear, HyTech Griffith)
  • Metres 55,500 m planned
  • Stage advanced/development
  • Context 50/50 BHP-Lundin Mining JV; most metres focused on Filo del Sol

Log

Source: Cobre: la campaña de exploración minera que perforará más de 55 mil metros en San Juan · Sep 11, 2026

DecCompleteEQ Resources ASX:EQRMt Carbine · Queensland, AustraliaResource and reserve updateW

Timing as stated: late 2026

  • Program 28-hole diamond/RC program
  • Metres 7,700 m planned
  • Stage producer exploration
  • Context Started Mar 16, 2026, ~4-month program

Log

  • Nov 1, 2026 Status 'complete' not verified: Apr 23 update had 8 of 28 holes (~2,610m of 7,700m); no completion release found. Resource/reserve update 'late 2026' confirmed
  • May 19, 2026 Tracked: 28-hole diamond/RC program

Source: Mt Carbine moves to boost reserves · May 19, 2026

Q4CompleteNGEx Minerals TSX:NGEXLunahuasi · San Juan, ArgentinaPhase 5 drilling start; Valle Ancho/Maricunga spin-out completionCuAuAg

Timing as stated: Q4 2026 (both)

  • Program Phase 4 complete (32 holes, 27,318m; final assays Jul 30, 2026); Phase 5 in planning plus exploration adit
  • Metres 27,318 m done
  • Stage discovery

Log

Source: NGEx Reports Q2 2026 Results; Phase 4 Drilling Delivers High Grades and Expands Lunahuasi Deposit · Aug 6, 2026

DecCompleteSAGA Metals TSXV:SAGARadar (Trapper South) · Labrador, CanadaMaiden Mineral Resource EstimateVTiFe

Timing as stated: 'imminent' per Oct 14, 2026 release headline

  • Program MRE drill program at Trapper Zone completed: 85 holes (R-0008 to R-0092), 22,432m (2,053m 2025 + 20,379m 2026)
  • Metres 22,432 m done
  • Assays pending None per Oct 14 headline (final Ti-V-Fe assays from MRE drilling)
  • Stage resource expansion
  • Context 63 holes completed by July 15, 2026

Log

Source: SAGA Metals Completes Mineral Resource Estimate Drill Program at Radar Critical Minerals Project in Labrador · Aug 25, 2026

January 2027 2 programs

Jan ’27Assays pendingEskay Mining Corp. TSXV:ESKCorey-Eskay · BC (Golden Triangle), CanadaDrill and surface mapping resultsAuAgCuZn

Timing as stated: over the next few months

  • Program 10 diamond holes, 4,344 m, Jul 20-Sep 16 2026
  • Metres 4,344 m done
  • Assays pending 1,509 core samples; certified ALS assays pending for most
  • Stage grassroots
  • Context Targets C-10, Vermillion, TM, Big Red, Sultan; partial assays done at in-house PortablePPB lab

Log

Source: Eskay Mining Corp. Announces Successful Completion of Its 2026 Drilling and Geological Mapping Program · Oct 14, 2026

Jan ’27DrillingPilbara Gold (ex-Kairos) ASX:PGLRoe Hills (Terra, Caliburn) · WA (Eastern Goldfields), AustraliaRoe Hills maiden Mineral Resource EstimateAu

Timing as stated: late 2026 / early 2027

  • Program Up to 12,000 m drilling (1,600 m at Caliburn)
  • Metres 12,000 m planned
  • Stage resource expansion
  • Context First drilling in eight years, started July 2026

Log

Source: Pilbara Gold Quarterly Activities Report June 2026 · Jul 20, 2026

Q1 2027 23 programs

Q1Assays pendingBarton Gold ASX:BGDTunkillia · South Australia (Gawler Craton), AustraliaTunkillia gold MRE update (model being updated); PFS and silver MREAuAg

Timing as stated: PFS by end Q1 CY27

  • Program Phase 1 and 2 RC/DD upgrade drilling (520 holes)
  • Metres 57,653 m done
  • Stage advanced/development
  • Context All assays complete; gold MRE date not given

Log

Source: 30 September 2026 Quarterly Activities Report · Oct 26, 2026

Feb ’27Assays pendingBoreal Gold CSE:BGLDNorth Star (Gold Rock Vein) · Manitoba (Snow Lake), CanadaFay Lake drilling; postponed Gold Rock holes in later winter programAu

Timing as stated: winter (unspecified)

  • Program Phase 4: 10 HQ holes, 1,326 m; ~1,000 m at Fay Lake (Flin Flon) to follow
  • Metres 1,326 m done
  • Assays pending Some Phase 4 assays pending at SRC
  • Stage resource expansion
  • Context GR-26-149: 15.54 g/t Au over 2.41 m

Log

Source: Boreal Gold Phase 4 Gold Rock drill results · Jul 30, 2026

Feb ’27Assays pendingCosa Resources / Denison Mines TSXV:COSAMurphy Lake North JV (Cyclone trend) · Saskatchewan, Athabasca Basin, CanadaSignificant follow-up winter drill campaignU

Timing as stated: early 2027

  • Program Summer 2026 drill program
  • Metres 6,752 m done
  • Assays pending Assays for N-fault unconformity holes MLN26-023, -024, -25A, -026, -028
  • Stage discovery
  • Context 13 holes over 650 m strike; winter hole MLN26-013 returned 5.0 m at 0.55% U3O8.

Log

Source: Cosa Announces Summer Drilling Results for Murphy Lake North Uranium Joint Venture with Denison Mines · Sep 14, 2026

H1 ’27Assays pendingKlondike Gold TSXV:KGKlondike District (Lone Star) · Yukon (Dawson), CanadaUpdated NI 43-101 mineral resource estimateAuTe

Timing as stated: H1 2027

  • Program ~12,446 m in 60 holes, 2026
  • Metres 12,446 m done
  • Assays pending Complete 2026 results outstanding (lab delays; Au and Te methods)
  • Stage resource expansion
  • Context Drilling targeted extensions of pit-constrained Lone Star MRE

Log

Source: Klondike Gold Completes 2026 Drilling, Advances Planned Mine · Oct 20, 2026

Q4DrillingAbitibi Metals CSE:AMQB26 · Quebec, CanadaPreliminary economic assessmentCuAuZnAg

Timing as stated: Q4 2026-Q1 2027

  • Program Funded for up to 80,000 m across 2026-2027; up to 3 rigs (conversion + expansion)
  • Metres 80,000 m planned
  • Stage resource expansion

Log

Source: Abitibi's B26 Drilling Now Runs on 2 Tracks: Resource Conversion, Down-Plunge Growth · Oct 1, 2026

Q1DrillingAlligator Energy ASX:AGESamphire (Blackbush, Plumbush) · South Australia, AustraliaBlackbush Mineral Resource updateU

Timing as stated: Q1/Q2 2027

  • Program c.300-hole delineation/extension program, 2 rigs
  • Stage advanced/development
  • Context Drilling through late Q4 2026; mineralisation extended 600 m south of Blackbush; Samphire FS targeted Q3 2027.

Log

Source: New Drilling Extends Uranium Mineralisation 600m South of Blackbush · Jul 28, 2026

Q1 ’27DrillingApex Critical Metals CSE:APXCRift · Nebraska, USAInitial mineral resource estimateREENb

Timing as stated: Q1 2027 (CEO also cited H1 2027)

  • Program Expanded step-out/infill drilling toward 22,000-25,000 m
  • Metres 12,000 m done of 25,000 m
  • Assays pending 12 holes (as of June 3)
  • Stage resource expansion
  • Context Program expanded ~50% over 8,000 m originally planned; 22-25k m targeted by Sept 2026

Log

Source: Apex Announces Drill Program Expansion and H2 Exploration Plans at the Rift Rare Earth Project · Jun 3, 2026

Q1 ’27DrillingBlue Moon Metals NASDAQ:BMMSpringer · Nevada, USADrilling completionW

Timing as stated: Q1 2027

  • Program 67,000 m two-phase diamond program, up to six rigs
  • Metres 67,000 m planned
  • Assays pending Historical core re-assay results
  • Stage advanced/development
  • Context Start H1 Aug 2026; production target Q4 2027 per earlier release

Log

Source: Blue Moon Announces Springer Tungsten 67,000 Metre Diamond Drill Program · Jul 7, 2026

Q1 ’27DrillingCambria Gold Mines TSXV:CAMBPremier-Northern Lights · BC (Golden Triangle), CanadaSilver Coin infill results; resource upgrade feeding Premier-Red Mountain feasibility studyAuAg

Timing as stated: Silver Coin results Oct 2026; feasibility study Q1 2027

  • Program Expanded to 42,000 m, 2026 resource upgrade program
  • Metres 42,000 m planned
  • Assays pending Not stated
  • Stage producer exploration
  • Context Prew Zone hole cut 3.1 m @ 166.2 g/t Au and 3,383 g/t Ag (Sept 22)

Log

Source: Cambria Gold Mines Announces 166.2 g/t Au and 3,383 g/t Ag over 3.1 Meters at Premier and Expanded Drilling Program · Sep 22, 2026

Mar ’27DrillingFireweed Metals TSXV:FWZMacpass (Tom South, Tom East) / Mactung · Yukon, CanadaUpdated Mactung Feasibility StudyZnPbAgGa

Timing as stated: early 2027

  • Program ~9,500m diamond/sonic: up to 7,500m Macpass, up to 2,000m Mactung
  • Metres 5,813 m done of 9,500 m
  • Stage resource expansion
  • Context Four rigs active (Aug 2026); Tom South extended 300m down-dip. Lundin-backed financing.

Log

Source: Fireweed Metals Commences 2026 Field Program · Jun 4, 2026

H1 ’27DrillingGR Silver Mining TSXV:GRSLSan Marcial / Plomosas · Sinaloa, MexicoResource update with PEAAg

Timing as stated: H1 2027

  • Program 20,000 m San Marcial program
  • Metres 20,000 m planned
  • Assays pending 7 holes (as of Sept 8)
  • Stage resource expansion
  • Context Results in batches every 5-6 weeks; 21 holes drilled by Sept 8

Log

Source: With Funding, Permits in Place, GR Silver's Drilling Shapes 2027 Resource Update · Oct 25, 2026

H1 ’27DrillingHeliostar Metals TSXV:HSTRAna Paula · Guerrero, MexicoAna Paula Feasibility StudyAu

Timing as stated: H1 2027

  • Program Infill/expansion drilling plus 6,500 m inferred upgrade
  • Metres 26,500 m planned
  • Stage advanced/development
  • Context Decline advancement from Q3 2026; production targeted H2 2028

Log

Source: Heliostar Provides 2026 Guidance and Growth Plan · Jan 13, 2026

Mar ’27DrillingIntegra Resources TSXV:ITRNevada North (Wildcat) · Nevada, USAUpdated Nevada North technical report (PFS targeted early 2027 per April release)Au

Timing as stated: 2027

  • Program Core + resource-conversion drilling
  • Metres 5,500 m planned
  • Stage advanced/development

Log

Source: Integra's 2027 'show me' moment comes into focus · Sep 23, 2026

Q1 ’27DrillingKodiak Copper TSXV:KDKMPD · British Columbia, CanadaUpdated mineral resource estimateCuAu

Timing as stated: Q1 2027

  • Program 16,500 m two-rig program at Ketchan, West and new 3D-IP target near South deposit
  • Metres 6,348 m done of 16,500 m
  • Assays pending Initial 2026 assays due within a month of mid-Aug; more through autumn and winter
  • Stage resource expansion
  • Context 32 holes completed as of the update

Log

Source: Kodiak Provides Exploration Update and Identifies Large Geophysical Target Adjacent to the South Deposit · Aug 12, 2026

H1 ’27DrillingNevada Canyon Gold OTC:NGLDLapon Canyon · Nevada, USAInitial NI 43-101 mineral resource estimateAu

Timing as stated: H1 2027

  • Program 2026 RC drill program (initial 10,000 m; earn-in to 50%)
  • Metres 10,000 m planned
  • Assays pending Further assays pending; lab backlog cited
  • Stage discovery
  • Context MRE delayed about a quarter due to assay lab backlog

Log

Source: Nevada Canyon Gold Corp. Form 8-K exhibit 99.1 · Oct 22, 2026

H1 ’27DrillingRPX Gold TSXV:RPXWawa Gold · Ontario (Michipicoten belt), CanadaUpdated MRE and pre-feasibility studyAu

Timing as stated: H1 2027

  • Program 20,000 m 2026, about half complete by Sept 16
  • Metres 10,000 m done of 20,000 m
  • Assays pending Not stated
  • Stage advanced/development
  • Context Jubilee deposit open down plunge; near-surface results could link North and South pits

Log

Source: RPX Gold Expands Gold Mineralization Beyond the PEA Open Pit and Underground Mine in Support of the Planned PFS · Sep 16, 2026

Feb ’27DrillingSkyharbour Resources / Orano Canada TSXV:SYHPreston Lake · Saskatchewan, Athabasca Basin, CanadaDrill results; detailed ground gravityU

Timing as stated: ground gravity early 2027

  • Program Summer 2026 drilling, ~10 holes (Orano operator)
  • Metres 3,500 m planned
  • Stage grassroots
  • Context 6-8 holes at FSAN, 2-4 at Area B corridor; drilling expected to start July 2026 after airborne gravity survey.

Log

Source: Skyharbour JV plans 3,500 m uranium drill program · Jun 23, 2026

Mar ’27DrillingSnowline Gold TSX:SGDRogue (Valley deposit) · Yukon, CanadaPre-feasibility studyAu

Timing as stated: early 2027

  • Program >10,000 m exploratory drilling (Valley, Gracie, Duke) plus geotech/hydro drilling, 2026
  • Metres 10,000 m planned
  • Assays pending Not stated
  • Stage advanced/development
  • Context Valley MRE 7.94 Moz M&I + 0.89 Moz Inferred; YESAB pre-submission from Q3 2026; ~C$100M cash

Log

Source: Snowline Gold Announces Fully Funded 2026 Project Development and Exploration Programs · May 5, 2026

Q1 ’27DrillingSouthern Cross Gold ASX:SX2Sunday Creek · Victoria, AustraliaPending assays; system extent defined and plant design studiesAuSb

Timing as stated: Q1 2027

  • Program 200 km program to end Q1 2027; 11 rigs
  • Metres 200,000 m planned
  • Assays pending 76 holes (54 Sunday Creek, 22 regional), incl. 11 in progress
  • Stage discovery
  • Context No MRE timing given

Log

Source: Southern Cross Gold Extends into Rising Sun Deep Drills 0.3 Metres @ 1,466 g/t Gold · Aug 25, 2026

Q1 ’27DrillingTitan Minerals ASX:TTMDynasty · Loja, EcuadorUpdated MRE then Dynasty Scoping StudyAuAg

Timing as stated: Q1 2027

  • Program Resource expansion drilling, 4 diamond rigs + RC rig from October
  • Metres 4,600 m done
  • Assays pending 17 diamond holes (~4,600 m) at Cerro Verde
  • Stage resource expansion
  • Context 3.9 Moz Dynasty resource

Log

Source: Titan Minerals extends high-grade gold-silver zone at Dynasty ahead of early-2027 resource update · Sep 8, 2026

Feb ’27PlannedBlue Sky Uranium TSXV:BSKAmarillo Grande (Cuatro, Ivana corridor) · Rio Negro, ArgentinaCuatro RC results (decide phase 2 ~30 holes/500 m)UV

Timing as stated: initial six-month phase

  • Program JV-funded RC drilling, 23 holes at Cuatro
  • Metres 500 m planned
  • Stage resource expansion
  • Context Funded by JV partner via Ivana Minerales; possible later 1,500 m RC/diamond.

Log

Source: Blue Sky Uranium Initiates New Joint-Venture Exploration Program at Amarillo Grande · Aug 18, 2026

Mar ’27PlannedBoss Energy ASX:BOEJasons and Gould's Dam (Honeymoon satellites) · South Australia, AustraliaSignificant drill programsU

Timing as stated: FY2027 (Jul 2026-Jun 2027)

  • Program FY2027 drill programs
  • Stage resource expansion
  • Context MRE released March 2026; development studies ongoing.

Log

Source: Boss Energy Annual Report 2026 · Aug 27, 2026

Q1CompleteBarton Gold ASX:BGDChallenger · South Australia (Gawler Craton), AustraliaChallenger definitive feasibility studyAu

Timing as stated: Q1 CY27

  • Program RC and DD resource drilling
  • Metres 9,387 m done
  • Stage advanced/development
  • Context 8,065 m RC + 1,322 m DD; gold MRE update pending

Log

Source: 30 September 2026 Quarterly Activities Report · Oct 26, 2026

Q2 2027 9 programs

Jun ’27Assays pendingCosa Resources / Traction Uranium TSXV:COSAAurora · Saskatchewan, Athabasca Basin, CanadaExpanded 2027 follow-up drill programU

Timing as stated: 2027

  • Program Partner-funded fall 2026 diamond drilling
  • Metres 541 m done
  • Assays pending Geochemical results for AU26-01 and second hole
  • Stage grassroots
  • Context 2 holes hit faulted graphitic basement (first at Aurora); no sandstone or significant alteration. Traction funding under option to earn up to 80%.

Log

Source: Cosa Announces Partner-Funded Drilling Results from the Aurora Uranium Project · Oct 19, 2026

H1 ’27Assays pendingScottie Resources TSXV:SCOTScottie Gold Mine project · BC (Golden Triangle, near Stewart), CanadaUpdated MRE alongside feasibility study for DSO mineAu

Timing as stated: H1 2027 (early H1 per company)

  • Program 2026 season drilling: 61,578 m in 227 holes (initial 52,000 m target)
  • Metres 61,578 m done of 52,000 m
  • Assays pending Not quantified; 2026 results still being released (Oct 2026)
  • Stage advanced/development
  • Context High-grade gold resource upgrade drilling for DSO concept

Log

Source: Scottie drills 25,000m at BC gold project · Aug 21, 2026

H1 ’27DrillingG Mining Ventures (ex-G2 Goldfields) TSX:GMINOko · Cuyuni-Mazaruni, GuyanaUpdated feasibility study / technical report for combined Oko West-Oko-Ghanie (G Mining)Au

Timing as stated: H1 2027

  • Program 100,000 m program, 6-8 rigs
  • Metres 100,000 m planned
  • Stage advanced/development
  • Context Program targeted for completion by year-end 2026; company being acquired by G Mining Ventures (~$3B, per Northern Miner)

Log

  • Nov 1, 2026 Jul 29 2026: G Mining Ventures closed G2 acquisition; G2 delisting, exploration spun into G3 Goldfields; more Oko drilling to upgrade historical resources, technical report intended 2027. Company field should read G Mining Ventures.
  • Feb 11, 2026 Tracked: 100,000 m program, 6-8 rigs

Source: G2 Announces New Gold Discoveries Outside Existing Mineral Resources and Provides Corporate Update · Feb 11, 2026

Jun ’27DrillingIntegra Resources TSXV:ITRFlorida Canyon · Nevada, USAUpdated Florida Canyon resources from dump and saddle drilling; renewed drilling at Standard Mine before end-2026Au

Timing as stated: 2027 (no date)

  • Program 2026 near-mine oxide + discovery drilling (part of 50,000 m company program)
  • Metres 42,500 m planned
  • Stage producer exploration
  • Context Company's largest drill program; Florida Canyon technical report released July 2026

Log

Source: Integra's 2027 'show me' moment comes into focus · Sep 23, 2026

Jun ’27DrillingRadisson Mining Resources TSXV:RDSO'Brien · Quebec (Abitibi, Cadillac Break), CanadaStep-by-step MRE updates as drilling progresses; program end H1 2027Au

Timing as stated: unspecified

  • Program 72,500 m in 2026 (140,000 m program to H1 2027), up to 8 rigs
  • Metres 72,500 m planned
  • Assays pending Not stated
  • Stage resource expansion
  • Context Interim MRE (Jan 2026): 0.63 Moz Ind @ 5.59 g/t + 1.69 Moz Inf @ 5.08 g/t

Log

Source: Radisson O'Brien updated MRE and 2026 drill program · Mar 2, 2026

Jun ’27DrillingRamelius Resources ASX:RMSMt Magnet / Dalgaranga / Cue / Rebecca-Roe · WA (Murchison/Goldfields), AustraliaGilbey's UG MRE (for PFS); Lena MRE and scoping studyAu

Timing as stated: FY27

  • Program FY27 ~240,000 m, A$90-110m budget
  • Metres 240,000 m planned
  • Assays pending Never Never North; West Island; Lena Deeps
  • Stage producer exploration
  • Context Priority targets: Galaxy UG, Franks Tower, Gilbey's, Lena, Break of Day

Log

Source: Ramelius Resources exploration update · Jul 22, 2026

Q2 ’27DrillingTectonic Metals TSXV:TECTFlat (Chicken Mountain) · Alaska, USAMaiden Chicken Mountain mineral resource estimate, then PEAAu

Timing as stated: PEA expected Q2 2027

  • Program 2026 RC/core program, drilling through late October
  • Metres 29,000 m done
  • Assays pending ~22,000 m of 2026 drilling
  • Stage discovery
  • Context ~3.3 km of continuous gold mineralization drill-defined

Log

Source: Tectonic drills 107m of 1.18 g/t gold · Oct 15, 2026

Jun ’27CompleteTrilogy MetalsArctic (Upper Kobuk Mineral Projects) · Ambler District, Alaska, United StatesData toward Arctic construction decision; Bornite expanded workCuZnPbAu

Timing as stated: Bornite from 2027

  • Program ~40 holes, >=5,400m engineering/technical drilling
  • Metres 5,400 m planned
  • Stage advanced/development
  • Context Ambler Metals 50/50 JV with South32. Drilling ran 15 Jun through Sep 2026 (completion assumed from schedule, not confirmed).

Log

Source: Trilogy Metals 2026 Upper Kobuk fieldwork · Jun 10, 2026

Jun ’27PausedFaraday Copper TSX:FDYCopper Creek · Arizona, USAResults from 24,000 m San Manuel/Kalamazoo program; MREs for Copper Creek and San ManuelCuMo

Timing as stated: Drill results no timing; MREs by mid-2027; Phase I PFS 2028

  • Program Phase IV drilling: 88 holes / 22,510 m; paused June 20, 2026
  • Metres 22,510 m done
  • Assays pending Unclear: ~35 Phase IV holes unreleased as of Aug 7; a Sept 3 release reported 14 holes (not verified)
  • Stage resource expansion
  • Context Drilling paused citing San Manuel acquisition from BHP

Log

Source: Faraday Copper Closes the Acquisition of the San Manuel Project in Arizona and Mobilizes Drill Rigs · Oct 15, 2026

Q3 2027 3 programs

H2 ’27DrillingIntegra Resources TSXV:ITRDeLamar · Idaho, USADeLamar NEPA Record of DecisionAuAg

Timing as stated: H2 2027

  • Program Metallurgical and geotechnical drilling
  • Metres 2,500 m planned
  • Stage advanced/development
  • Context Construction-start permits targeted spring 2028

Log

Source: Integra's 2027 'show me' moment comes into focus · Sep 23, 2026

Aug ’27DrillingPlatinum Group Metals TSX:PTMWaterberg (T-Zone) · Northern Limb, Bushveld, South AfricaT-Zone Study completion (funded in fiscal 2027 budget)PtPdRhAu

Timing as stated: fiscal 2027 (Sep 2026-Aug 2027)

  • Program 14 NQ metallurgical boreholes (re-entries with deflections) for 600-800kg T-Zone sample
  • Stage advanced/development
  • Context Waterberg JV: PTM 37.42%, Mnombo 26%, HJM (JOGMEC/Hanwa) 21.95%, Implats 14.63%.

Log

Source: Platinum Group Metals Ltd. Reports Third Quarter 2026 Results · Jul 15, 2026

Sep ’27PlannedEagle Nuclear Energy / Aurora Energy Metals ASX:1AEAurora Uranium Project · Oregon, USABLM and Oregon DOGAMI drill permits; PFSU

Timing as stated: PFS targeted 2H 2027

  • Program ~47-hole infill/expansion diamond program
  • Metres 8,230 m planned
  • Stage advanced/development
  • Context ~27,000 ft; drilling starts once permits granted; aims to upgrade to Measured & Indicated.

Log

Source: Aurora Energy Metals set to receive US$10M milestone payments as Eagle Nuclear initiates extensive drilling at Aurora · Jul 29, 2026

Q4 2027 2 programs

Dec ’27DrillingNew Found Gold TSXV:NFGQueensway · Newfoundland, CanadaUpdated technical report and MRE; first ore processing targeted late 2027Au

Timing as stated: unspecified

  • Program 90,000 m diamond, 6 rigs, C$44M program
  • Metres 32,000 m done of 90,000 m
  • Assays pending ~8% of 2025 results outstanding (as of Jun 2)
  • Stage advanced/development
  • Context 40,000 m targeted exploration (AFZ Core deep, Dropkick, regional)

Log

Source: New Found Gold Expands Queensway Work Program: Focus on Discovery and Resource Growth · Jun 2, 2026

Dec ’27DrillingWA Gold ASX:WAUAbercromby · WA (Yilgarn), AustraliaAbercromby FIDAu

Timing as stated: 2027 (pathway slide: late 2027-early 2028)

  • Program 54-hole ~7,200 m RC program in progress; ~6,000 m diamond step-out/geotech ongoing
  • Metres 3,136 m done of 7,200 m
  • Assays pending RC assays expected within weeks
  • Stage advanced/development
  • Context Scoping study April 2026; 518 koz resource

Log

Source: Abercromby and Bullabulling Gold Projects (Australian Gold Conference presentation) · Oct 14, 2026

Timing not given 86 programs

TBAAssays pendingAlaska Silver TSXV:WAMIllinois Creek (Waterpump Creek, Silver Sage) · Western Alaska, United States2026 drill assays (Waterpump Creek Zn-Pb-Ag, Silver Sage)AgZnPbAu

Timing as stated: unspecified

  • Program Expanded 9,000m program completed: 9,495.9m in 39 holes
  • Metres 9,496 m done of 9,000 m
  • Assays pending 6,753 core samples at ALS incl. 12 Waterpump Creek holes
  • Stage resource expansion
  • Context Waterpump Creek inferred 2.39Mt @ 279g/t Ag, 11.25% Zn, 9.84% Pb; final sample shipment 23 Sep 2026.

Log

Source: Alaska Silver Completes 9,496-Metre Drilling Program at Illinois Creek, with Waterpump Creek Zinc-Lead Assays Pending · Oct 9, 2026

TBAAssays pendingAlex Metals TSXV:ALXWodski (Mad Dog) / KSO · Alaska, United StatesRemaining KSO assays (Triple G, Stumble-On) and Wodski/Mad Dog assays; Frenchie mapping/geophysics for 2027 targetsZnPbAg

Timing as stated: unspecified

  • Program 2026: 6,196m total — KSO 3,058m (Khayyam, Stumble-On, Triple G), Wodski 3,138m (Mad Dog)
  • Metres 6,196 m done
  • Assays pending KSO: Triple G and Stumble-On holes; Wodski: all 2026 assays
  • Stage discovery
  • Context Historical Mad Dog grades 8-22% Zn; Frenchie project surveys for future targets.

Log

Source: Alex drills high-grade copper in SE Alaska · Oct 27, 2026

TBAAssays pendingAppia Rare Earths & Uranium CSE:APIAlces Lake · Saskatchewan, CanadaREE assay resultsREE

Timing as stated: unspecified

  • Program 2026 summer diamond drilling (6 of 9 planned holes)
  • Metres 1,441 m done
  • Assays pending 274 core samples at SRC
  • Stage discovery
  • Context Monazite visually identified in 3 of 6 holes; 3 planned holes not drilled

Log

Source: Appia Rare Earths Confirms REE-Bearing Monazite in Half of 2026 Alces Lake Drill Holes · Aug 6, 2026

TBAAssays pendingCanada Nickel TSXV:CNCReid · Timmins, Ontario, CanadaResults from remaining 7 Reid holesNiCo

Timing as stated: unspecified

  • Program 9-hole infill program to upgrade resource categories
  • Assays pending 7 of 9 holes
  • Stage resource expansion
  • Context First two holes: REI26-92A 576.6m @ 0.29% Ni; resource published 12 Jan 2026.

Log

Source: Canada Nickel Reports Additional Exploration Drilling Results · Aug 6, 2026

TBAAssays pendingDenison Mines TSX:DMLMcClean Lake · Saskatchewan, Athabasca Basin, CanadaWinter program assay resultsU

Timing as stated: unspecified

  • Program Winter 2026 drill program
  • Metres 9,756 m done of 9,756 m
  • Assays pending Assays from 41-hole winter program
  • Stage producer exploration
  • Context 41 holes / 9,756 m; ML-TEM survey results under consideration.

Log

Source: Denison Mines Q2 2026 MD&A (Form 6-K) · Aug 12, 2026

TBAAssays pendingGold Hunter Resources CSE:HUNTGreat Northern · Newfoundland (White Bay), CanadaAssay resultsAu

Timing as stated: unspecified

  • Program 2,879 m in 13 holes across 6 targets (planned up to 10,000 m); Thor drilling deferred to 2027
  • Metres 2,879 m done of 10,000 m
  • Assays pending 13 holes / 2,879 m at ALS
  • Stage grassroots
  • Context Drilling halted when budget reached; inaugural program

Log

Source: Gold Hunter Concludes 2026 Drill Program at the Great Northern Project · Sep 28, 2026

TBAAssays pendingIsoEnergy TSX:ISOLarocque East (Hurricane South Trend) · Saskatchewan, Athabasca Basin, CanadaSRC assays; used to define 2027 drill targetsU

Timing as stated: unspecified

  • Program Summer 2026 drill program
  • Metres 10,159 m done of 8,000 m
  • Assays pending All summer samples at SRC
  • Stage resource expansion
  • Context 26 holes; 3 holes >35,000 cps; radioactivity over 600 m strike. 16,963 m / 43 holes YTD incl. winter.

Log

Source: What IsoEnergy's strongest South Trend radioactivity to date means for Hurricane's growth story · Sep 10, 2026

TBAAssays pendingKali Metals ASX:KM1Marble Bar · WA (Pilbara), AustraliaPhase III drilling at Marble BarAu

Timing as stated: unspecified

  • Program Phase II RC/DD done; Phase III planned
  • Metres 4,341 m done
  • Assays pending Tiger, Churchill, Sherman
  • Stage discovery

Log

Source: Kali Metals Quarterly Activities Report June 2026 · Jul 27, 2026

TBAAssays pendingKingfisher Metals TSXV:KFRHWY 37 (Hank porphyry) · British Columbia, Canada2026 Hank porphyry assay resultsCuAu

Timing as stated: unspecified

  • Program 2026 program completed at 13,551m (four rigs at peak); 15,000m planned
  • Metres 13,551 m done of 15,000 m
  • Assays pending Most 2026 holes incl. HW-26-019, HW-26-016, HW-26-023 and remainder of HW-26-015 (rush assay only released)
  • Stage discovery
  • Context Assay turnaround ~6-8 weeks; completion figure from release headline listed on Newsfile

Log

Source: Kingfisher Reports 8.8 m of 38.50 g/t AuEq Within 27 m of 13.61 g/t AuEq at HWY 37 Project, Golden Triangle · Sep 21, 2026

TBAAssays pendingLE Minerals ASX:LELBurke / Mt Dromedary · Queensland, AustraliaRemaining assays, then combined upgraded JORC resourceC

Timing as stated: unspecified

  • Program 52-hole RC and diamond program (June 2026)
  • Metres 5,877 m done
  • Assays pending 22 holes (18 RC, 4 diamond)
  • Stage resource expansion
  • Context Intercepts incl. 88 m at 17.3% TGC

Log

Source: LE Minerals Validates High-Grade Graphite Continuity Between Burke and Mt Dromedary · Jul 29, 2026

TBAAssays pendingManhattan Corporation ASX:MHCHook Lake (Jaws) · Nunavut, CanadaResults from other maiden targetsAu

Timing as stated: unspecified

  • Program Maiden 4,000 m RC program; maiden holes at Spectre, Quantum, Lotus, Omega
  • Metres 4,000 m planned
  • Assays pending Results from maiden holes at Spectre, Quantum, Lotus, Omega not yet visible
  • Stage discovery
  • Context Jaws anomalous gold confirmed over >1,250 m strike; 4,000 m RC figure from Jul 23 quarterly report

Log

Source: Manhattan more than doubles Jaws strike · Sep 25, 2026

TBAAssays pendingNorth American Niobium and Critical Minerals CSE:NIOBBardy · Quebec, CanadaAssay results after QA/QCREENb

Timing as stated: unspecified

  • Program 2026 diamond drilling, 8 holes
  • Metres 1,554 m done
  • Assays pending All 8 holes at SGS Val-d'Or
  • Stage grassroots
  • Context All holes hit target pegmatite dyke swarm; allanite logged

Log

Source: North American Niobium Completes 2026 Bardy Drilling with Eight Pegmatite Hits; Awaiting Assay Results · Jul 28, 2026

TBAAssays pendingPaladin Energy ASX:PDN; TSX:PDNPatterson Lake South (Triple R, Atlas, R1515W) · Saskatchewan, Athabasca Basin, CanadaFollow-up of R1515W new zone (PLS26-779) and NE-of-Atlas mineralisationU

Timing as stated: unspecified

  • Program 2026 PLS exploration and resource drilling
  • Metres 15,006 m done
  • Assays pending Chemical assay verification of eU3O8 gamma results
  • Stage advanced/development
  • Context Atlas 8,755.4 m (25 holes) + R1515W 6,250.5 m (20 holes); total excludes Saloon East.

Log

Source: PLS Exploration Delivers New High-Grade Results · Sep 2, 2026

TBAAssays pendingSilver Pony ResourcesSilver Pony · British Columbia, CanadaAssay resultsAgPbZn

Timing as stated: unspecified

  • Program 10-hole drill program
  • Metres 2,280 m done
  • Assays pending All 10 holes
  • Stage grassroots
  • Context Visible galena in five of six Revelstoke Trend holes

Log

Source: Silver Pony Reports Multiple Mineralised Intervals in All Six Revelstoke Holes · Oct 9, 2026

TBAAssays pendingStandard Uranium TSXV:STNDDavidson River (Warrior, Bronco, Thunderbird) · Saskatchewan, Athabasca Basin, CanadaAssays; further programs being plannedU

Timing as stated: unspecified

  • Program Summer 2026 diamond drilling
  • Metres 6,734 m done
  • Assays pending Whole-rock geochem and U3O8 assays at SRC
  • Stage grassroots
  • Context 12 holes; peak 1,650 cps in DR-26-040; dravite clay alteration on Bronco corridor.

Log

Source: Standard Uranium Davidson River summer drill program update · Oct 1, 2026

TBAAssays pendingSun Summit MineralsJD · BC (Toodoggone), CanadaInaugural mineral resourceAuAg

Timing as stated: unspecified

  • Program 16,000+ m in 55 holes (expanded from 10,000 m planned)
  • Metres 16,000 m done of 10,000 m
  • Assays pending Not stated
  • Stage resource expansion
  • Context Program supports first resource estimate at JD gold-silver project

Log

Source: Sun Summit drills 16,000 meters at JD · Sep 18, 2026

TBAAssays pendingTransition Metals TSXV:XTMSaturday Night · Thunder Bay, Ontario, CanadaAssays from late-2025 drilling; 2026 follow-up drillingPtPdNiCu

Timing as stated: 2026 (unspecified)

  • Program Additional geophysics and targeted drilling recommended for 2026
  • Metres 1,463 m done
  • Assays pending Late-2025 core (SN-25-03 extension, SN-25-04, SN-25-05)
  • Stage discovery
  • Context Basal mineralised zone ~800m x 200m, open; supported by Ontario Junior Exploration Program.

Log

Source: Transition Metals Provides Corporate Update and 2026 Outlook · Jan 22, 2026

TBAAssays pendingTudor Gold TSXV:TUDTreaty Creek (CBS, Perfectstorm) · BC (Golden Triangle), CanadaDrill results; Goldstorm underground PEA; SC-1 ramp permitAuAgCu

Timing as stated: unspecified

  • Program Min. 10,000 m (2,000 m CBS, 8,000 m Perfectstorm), 2 rigs, to late Sept/early Oct
  • Metres 10,000 m planned
  • Assays pending Not stated
  • Stage resource expansion
  • Context PS-23-10: 1.23 g/t Au over 102.15 m; Goldstorm underground PEA underway

Log

Source: Tudor Gold Commences 2026 Exploration Drill Program at Treaty Creek · May 21, 2026

TBAAssays pendingVal-d'Or Mining (Eldorado Gold option) TSXV:VZZPerestroika · Quebec (Val-d'Or), CanadaRemaining assaysAu

Timing as stated: unspecified

  • Program 25 NQ holes, 12,477 m, 2 rigs, finished Apr 2026 (Eldorado operator)
  • Metres 12,477 m done of 8,000 m
  • Assays pending 6,127 sample results outstanding; 2,783 samples not yet dispatched
  • Stage discovery
  • Context PE-26-027: 3.08 g/t Au over 84 m; Eldorado earning to 70%

Log

Source: Val-d'Or Mining Diamond Drill Program Update - Perestroika Prospect · Aug 5, 2026

TBAAssays pendingWallbridge Mining TSX:WMMartiniere / Fenelon / Casault / Grasset · Quebec (Detour-Fenelon belt), CanadaMartiniere Phase 2 results; Fenelon met work toward PFSAu

Timing as stated: unspecified

  • Program ~25,000 m total (Martiniere ~17,000 m in 2 phases), 2 rigs then 1 to late Sept
  • Metres 25,000 m planned
  • Assays pending Not stated
  • Stage resource expansion
  • Context ~C$27M 2026 budget; Casault option to earn 50%

Log

Source: Wallbridge Launches 2026 Exploration and Technical Studies Programs · Feb 17, 2026

TBADrillingAmarc Resources TSXV:AHRJOY district (AuRORA, TWINS) · British Columbia, CanadaAuRORA delineation and TWINS drill resultsCuAuAg

Timing as stated: unspecified

  • Program C$20M Freeport-funded 2026 program, three rigs
  • Stage discovery
  • Context Freeport holds 60% and is funding C$75M Stage 2 earn-in toward 70%; ~C$35.9M remaining after 2026

Log

Source: Amarc Announces 2026 Joy District Budget Increased to $20 Million · Jul 21, 2026

TBADrillingArizona Gold & Silver TSXV:AZSSilverton · Nevada, USAAssay results as availableAuSb

Timing as stated: unspecified

  • Program 27-hole RC program from 17 pads
  • Stage grassroots
  • Context Three ~150 m holes cased for possible diamond extensions

Log

Source: Arizona Gold & Silver Commences 27-Hole Drill Program at Silverton Gold-Antimony Project · Jun 9, 2026

TBADrillingAterian plc LSE:ATNPL2622/2023 · Kalahari Copper Belt, BotswanaPriority targets from soil results, then two ~5km IP traverses toward drill targetingCu

Timing as stated: unspecified

  • Program ~90 km2 soil geochemical survey; deep IP/resistivity traverses to follow
  • Stage grassroots
  • Context Fieldwork commenced 9 Apr 2026; drilling contingent on results.

Log

Source: Commencement of Work at KCB, Botswana · Apr 9, 2026

TBADrillingAugustus Minerals ASX:AUGMusic Well (Clifton East) · WA (Leonora), AustraliaDiamond drill results; RC at St Patrick's Well and Black Cat EastAu

Timing as stated: unspecified

  • Program RC programs + 200 m diamond hole
  • Metres 1,650 m done
  • Assays pending Second RC program; diamond hole
  • Stage discovery
  • Context Gold Fields subsidiary took 5% in placement

Log

Source: Augustus Minerals Quarterly Activities Report June 2026 · Jul 30, 2026

TBADrillingAwalé Resources TSXV:ARICOdienné · Denguélé, Côte d'IvoireResource expansion drilling results; initial studiesAuCu

Timing as stated: unspecified

  • Program Ongoing drilling to expand/upgrade resource and test JV targets
  • Stage resource expansion
  • Context Initial inferred 1.71 Moz AuEq; Predictive Discovery took ~12.3% for US$10M

Log

Source: Predictive Discovery buys minority stake in West Africa-focused explorer · Jul 15, 2026

TBADrillingBlue Moon Metals TSXV:MOONNussir · Finnmark, NorwayResource expansion from directional drillingCuAuAg

Timing as stated: unspecified

  • Program ~10,000m (3,000m surface infill + 7,000m underground) plus 4,000m surface directional program
  • Metres 10,000 m planned
  • Stage advanced/development
  • Context Part of 40,000m company-wide 2026 plan incl. NSG (Rupsi) Cu-Zn ~10,000m underground; holders include Oaktree, Hartree, Wheaton, Altius.

Log

Source: Blue Moon advances four core assets with comprehensive 40,000 meter 2026 infill and step-out drilling programs · Feb 11, 2026

TBADrillingBoss Energy / enCore Energy ASX:BOE; NASDAQ:EUAlta Mesa East (Tacubaya) · Texas, ISR, USADrill resultsU

Timing as stated: unspecified

  • Program Extension drilling at Alta Mesa East
  • Stage producer exploration
  • Context Boss 30% / enCore 70% at Alta Mesa.

Log

Source: Boss Energy Annual Report 2026 · Aug 27, 2026

TBADrillingBP Silver TSXV:BPAGCosuno · Potosi, BoliviaPhase 2 assays (Pocanita Chica, Jalsuri)Ag

Timing as stated: unspecified

  • Program Phase 2: 19 holes/2,290 m done, at least 8 more holes, of ~8,000 m 2026 campaign
  • Metres 8,000 m planned
  • Assays pending 17 completed Phase 2 holes
  • Stage discovery
  • Context Phase 1 hit 5 m at 600 g/t Ag

Log

Source: BP Silver Corp. Returns 1,328 g/t Silver Equivalent over 3.0 Meters at Pocañita Chica Target - Discovers Significant Feeder Structure · Sep 29, 2026

TBADrillingBrixton Metals TSXV:BBBThorn (Camp Creek, Trapper) · British Columbia, CanadaUpdated Camp Creek porphyry resource; maiden Trapper resourceCuAuAg

Timing as stated: unspecified

  • Program Fully funded 10,000 m 2026 program; drilling began June 1
  • Metres 249 m done of 10,000 m
  • Stage resource expansion
  • Context metres_completed as of June 11 release

Log

Source: Brixton Metals Commences 2026 Thorn Project Exploration Program · Jun 11, 2026

TBADrillingCobre ASX:CBEOkavango Copper Project / Kitlanya / Ngami · Kalahari Copper Belt, BotswanaOkavango follow-up drilling results; Ngami ISCR well-field commissioning and Equinor flow testsCuAg

Timing as stated: unspecified

  • Program Okavango follow-up drilling (Sinomine-funded) and BHP-planned drilling at Kitlanya West/East and Ngami
  • Stage resource expansion
  • Context Sinomine extended A$1.5m investment for second Okavango round; BHP earn-in partner on Kitlanya; Equinor partnering on Ngami in-situ recovery.

Log

Source: Cobre Limited Partners with Equinor to Enhance Ngami ISCR Copper Recovery and Advances Botswana Exploration Initiatives · Jul 23, 2026

TBADrillingCritical Elements Lithium TSXV:CRERose West · Quebec (James Bay), CanadaPending assays; resumption after forest-fire pauseLi

Timing as stated: unspecified

  • Program 10,000 m summer drill program (Phase 2), two rigs
  • Metres 2,073 m done of 10,000 m
  • Assays pending 6 holes (RW-26-36, 37, 54, 55, 56A, 57)
  • Stage discovery
  • Context Drilling paused by forest fires, to resume when safe; new Pegmatites 6 and 7 found

Log

Source: Critical Elements 10,000-Meter Summer Drill Program at Rose West Resumes with Positive Results · Aug 12, 2026

TBADrillingDLP Resources TSXV:DLPEsperanza · Arequipa, PeruDrill resultsCuAuMo

Timing as stated: unspecified

  • Program ~3,000 m, seven diamond holes (four shallow oxide, three deep porphyry)
  • Metres 3,000 m planned
  • Stage discovery
  • Context First hole expected collared Sept 18, 2026

Log

Source: DLP Resources Esperanza drill program · Sep 10, 2026

TBADrillingDryden Gold TSXV:DRYGold Rock · Ontario (Dryden District), CanadaDown-plunge results; regional results (Mud Lake, Hyndman, Selby)Au

Timing as stated: unspecified

  • Program 45,000 m 2026, 2 rigs (second from July)
  • Metres 45,000 m planned
  • Assays pending Down-plunge holes pending (count not given)
  • Stage resource expansion
  • Context DGR-058: 7.88 g/t Au over 12.70 m (Sept 23); visible gold at Mud Lake North

Log

Source: Dryden Gold Launches Major Regional Exploration Program · Jun 16, 2026

TBADrillingF3 Uranium TSXV:FUUPatterson Lake North (PLN, Minto, Broach) · Saskatchewan, Athabasca Basin, CanadaSummer drill results; Tetra DCIP interpretationU

Timing as stated: unspecified

  • Program Summer 2026 drilling on new targets
  • Metres 4,000 m planned
  • Stage discovery
  • Context ~4,000 m initial; targets on Broach (Patterson West, Broach Lake South) and Minto A4 trend.

Log

Source: F3 Begins Summer Drilling at PLN Project After Completing 3D DCIP and Resistivity Survey Over Tetra Zone · Jul 21, 2026

TBADrillingF4 Uranium / UraniumX Discovery TSXV:FFUMurphy Lake Property · Saskatchewan, Athabasca Basin, CanadaAssaysU

Timing as stated: unspecified

  • Program 2026 drill program (UraniumX option funding)
  • Metres 2,500 m planned
  • Assays pending Core samples at SRC
  • Stage grassroots
  • Context Radiometric anomalies in 300 m step-outs; a later UraniumX release headline reports program expanded to 4,000 m.

Log

Source: F4 and UraniumX Hit Anomalous Radioactivity in 300 m Step Out Holes · Jun 9, 2026

TBADrillingFury Gold Mines TSX:FURYCommittee Bay (Three Bluffs, Antler) · Nunavut (Kitikmeot), CanadaDrill results to feed updated mineral resource estimateAu

Timing as stated: unspecified

  • Program ~5,000 m diamond, ~16 holes (13 Three Bluffs, 3 Antler), 2026 season
  • Metres 5,000 m planned
  • Assays pending Not stated
  • Stage resource expansion
  • Context Infill/expansion along ~1 km strike at Three Bluffs; Fury also fully funded for 2026 Eau Claire (Quebec) program

Log

Source: Fury Commences 2026 Drilling Program at Committee Bay in Nunavut · Jul 7, 2026

TBADrillingGalloper Gold CSE:BOOMGlover Island · Newfoundland (western), CanadaFurther drill resultsAu

Timing as stated: unspecified

  • Program ~7,000m NQ diamond, 30 holes; commenced Sept 8 2026
  • Metres 7,000 m planned
  • Assays pending Not stated
  • Stage discovery
  • Context Significant mineralization reported Sept 22

Log

Source: Galloper Gold Commences Diamond Drilling at Glover Island · Sep 8, 2026

TBADrillingGenesis Minerals ASX:GMDLaverton/Leonora · WA (Eastern Goldfields), AustraliaLaverton plant expansion studies / drilling resultsAu

Timing as stated: unspecified

  • Program FY27 exploration budget raised to A$80-90m
  • Stage producer exploration
  • Context Magnetic Resources (Lady Julie) acquisition completed

Log

Source: Drilling builds case for production growth at Laverton · Jun 26, 2026

TBADrillingGoldMining Inc. TSX:GOLDYarumalito · Antioquia/Caldas, ColombiaDrill resultsAuCu

Timing as stated: unspecified

  • Program Diamond drilling: 3 holes on P-1 porphyry, 1 on epithermal veins
  • Metres 1,200 m planned
  • Stage grassroots
  • Context 4 holes planned

Log

Source: GoldMining Commences 2026 Exploration Drilling Program at its Yarumalito Gold-Copper Project, Colombia · May 26, 2026

TBADrillingGorilla Gold Mines ASX:GG8Mulwarrie / Comet Vale / Vivien · WA (Eastern Goldfields), AustraliaOngoing drill resultsAu

Timing as stated: unspecified

  • Program 2026 program >150,000 m, 6 rigs
  • Metres 150,000 m planned
  • Assays pending Comet Vale, Mulwarrie, Vivien
  • Stage resource expansion
  • Context 21,200 m drilled in reported quarter; later headline cites resource up 109% to 2.0 Moz

Log

Source: Gorilla Gold Mines (GG8) Q3 2026 TU summary · Jun 14, 2026

TBADrillingGuanajuato Silver TSXV:GSVRBolanitos, El Cubo, VMC, San Ignacio, Topia, Horcon · Guanajuato / Durango / Jalisco, MexicoResource updates and initial reservesAgAu

Timing as stated: unspecified

  • Program ~75,000 m (45k exploration, 30k infill)
  • Metres 75,000 m planned
  • Stage producer exploration
  • Context Program to support 2026-27 mine plans

Log

Source: Guanajuato Silver Plans Record 75,000m Drill Program for 2026 · Feb 3, 2026

TBADrillingHecla Mining NYSE:HLGreens Creek · Admiralty Island, Alaska, United StatesQ3 2026 exploration results incl. Zinc Creek follow-upAgZnPbAu

Timing as stated: unspecified

  • Program Underground definition drilling with 3 rigs (East, 200s, 5250, Gallagher, Upper Plate); exploration at Zinc Creek, Gallagher, 5250 Offset
  • Stage producer exploration
  • Context 2026 exploration and pre-development guidance US$55m (company-wide).

Log

Source: Hecla Reports Excellent Q2 2026 Exploration Results · Jul 29, 2026

TBADrillingHorizon Gold ASX:HRNGum Creek · WA (Murchison/Mid-West), AustraliaFollow-up RC/diamond results; RC moves to Wyooda resource areaAu

Timing as stated: unspecified

  • Program RC/diamond infill and extension across 9 prospects
  • Stage resource expansion
  • Context 2.30 Moz resource; Kingfisher diamond drilling continuing

Log

Source: Quarterly Activities Report for the Period Ended 30 September 2026 · Oct 29, 2026

TBADrillingKaili Resources ASX:KLRMallee (Coodalya) · South Australia, AustraliaAircore assay resultsREE

Timing as stated: unspecified

  • Program 16-hole aircore program
  • Metres 288 m planned
  • Stage grassroots
  • Context Drilling to start ~week after July 16, 2026

Log

Source: Kaili Resources to Begin Rare Earth Drilling in South Australia · Jul 16, 2026

TBADrillingKaoko Metals ASX:KAOChalkos Copper-Silver Project (Donkey Hill, Otniel) · Kaoko Copper Belt, NamibiaMaiden drill results feeding geological modelCuAg

Timing as stated: unspecified

  • Program Maiden diamond drilling, ~2,000-3,000m first phase
  • Metres 3,000 m planned
  • Stage discovery
  • Context Mobilisation began 3 Aug 2026; metres_planned uses top of 2,000-3,000m range.

Log

Source: Kaoko Metals Initiates First Diamond Drilling at Namibia's Chalkos Copper-Silver Project · Aug 6, 2026

TBADrillingLeviathan Metals TSXV:LVXCentral Project · Kalahari Copper Belt, BotswanaAssay results, then step-out drilling on best zonesCuAg

Timing as stated: in due course (unspecified)

  • Program Diamond drilling; 14 holes completed, more holes on dome nose and limbs
  • Metres 3,600 m done
  • Assays pending Core cutting/sampling and lab assays for 14 holes; minor Cu sulphides seen in 8 holes
  • Stage discovery
  • Context Program announced 2 Jun 2026; pXRF screening used while lab assays pending.

Log

Source: Leviathan Metals provides update on its diamond drilling program at the Central Project, Kalahari Copper Belt, Botswana · Aug 12, 2026

TBADrillingLion Copper and Gold CSE:LEOYerington · Nevada, USAFeasibility study under Nuton earn-inCu

Timing as stated: unspecified

  • Program Nuton-funded exploration (US$5.0M in H1 2026) toward feasibility
  • Stage advanced/development
  • Context Funded by Nuton LLC (Rio Tinto venture)

Log

Source: Lion Copper & Gold Corp. Form 10-Q (Q2 2026) · Aug 7, 2026

TBADrillingLundin Gold TSX:LUGFruta del Norte district · Zamora-Chinchipe, EcuadorDrill results / reserve growthAuCu

Timing as stated: unspecified

  • Program Multi-year near-mine and regional exploration; 18 rigs (7 underground, 11 surface)
  • Metres 133,000 m planned
  • Stage producer exploration
  • Context ~133,000 m cited as part of three-year program launched 2025; porphyry Cu targets identified near mine

Log

Source: Lundin Gold US$100M 2026 Ecuador exploration at Fruta del Norte · Feb 13, 2026

TBADrillingLux Metals TSXV:LXMLa Grande (Zone 32) · Quebec (James Bay), CanadaZone 32 expansion and regional target resultsAu

Timing as stated: unspecified

  • Program Initial 5,000 m diamond, start Q3 2026
  • Metres 5,000 m planned
  • Assays pending Not stated
  • Stage discovery
  • Context Regional grabs up to 34 g/t (Wogogoosh) and 24 g/t (Orezone)

Log

Source: Lux Metals Receives Permits, Outlines 2026 Exploration Program at La Grande Gold Project · May 26, 2026

TBADrillingMa'aden TADAWUL:1211Arabian Shield (Mansourah Massarah, Wadi Al Jaww, Mahd) · Arabian Shield, Saudi ArabiaMansourah Massarah underground studies; further resource updatesAuCu

Timing as stated: unspecified

  • Program Continued 2026 exploration drilling after 2025 resource additions
  • Stage producer exploration
  • Context 2025 drilling added 7.8 Moz; ~55 km drilled at Wadi Al Jaww

Log

Source: Drilling push pays off with more gold · Jan 14, 2026

TBADrillingMany Peaks Minerals ASX:MPKOuarigue / Ferké / Odienné / Baga · Northern Côte d'Ivoire, Côte d'IvoireOuarigue pre-feasibility studyAu

Timing as stated: unspecified

  • Program >60,000 m budgeted across CI projects through CY2026
  • Metres 39,000 m done of 60,000 m
  • Assays pending AC/auger at Odienné and Baga
  • Stage resource expansion
  • Context Maiden 1.32 Moz MRE (source attribution to Ouarigue vs Ferké inconsistent)

Log

Source: Many Peaks Minerals (MPK) Q4 2026 TU summary · Jul 28, 2026

TBADrillingMarimaca Copper TSX:MARIPampa Medina · Antofagasta, ChileResults of diamond extensions below ~580 mCuAg

Timing as stated: unspecified

  • Program ~30,000m 2026 Pampa Medina drilling; diamond tails extending RC holes (incl. SWR-13) that stopped at ~580m RC limit
  • Metres 30,000 m planned
  • Stage discovery
  • Context SPRD-15: 216 m at 0.96% Cu from 466 m; ~28 km east of Marimaca Oxide Deposit

Log

Source: Marimaca hits thick copper-silver zone at Pampa Medina in Chile · Sep 8, 2026

TBADrillingMyriad Uranium CSE:MCopper Mountain · Wyoming, USALab assays confirming radiometric results; continued Phase II toward maiden resourceU

Timing as stated: unspecified

  • Program Phase II: Lucky Cliff (4 holes) then other historical-resource areas incl. Gem (3 holes, 507m); infill for NI 43-101 MRE to follow
  • Assays pending Lab assays to verify gamma-probe eU3O8 results (Lucky Cliff, Gem)
  • Stage resource expansion
  • Context Started July 2026 at Lucky Cliff; source is issuer-paid research.

Log

Source: Myriad Uranium Announces Further Phase II Drill Results from Copper Mountain · Sep 10, 2026

TBADrillingNewcore Gold TSXV:NCAUEnchi (Nyam) · Western Region, GhanaFurther drill results; resource update incorporating post-PFS drillingAu

Timing as stated: unspecified

  • Program Expanded 2026 drill program, 4 rigs
  • Metres 50,470 m done of 80,000 m
  • Stage advanced/development
  • Context Recent drilling not in current resource or PFS mine plan; mining lease application in progress

Log

Source: Newcore Gold Drilling Intersects 1.16 g/t Gold over 41.0 Metres at the Enchi Gold Project, Ghana · Oct 6, 2026

TBADrillingNexGen Energy TSX:NXERook I - Patterson Corridor East (PCE) · Saskatchewan, Athabasca Basin, CanadaFurther PCE drill results; fifth rig being addedU

Timing as stated: unspecified

  • Program Summer 2026 PCE drill program
  • Metres 20,139 m done of 42,000 m
  • Stage discovery
  • Context ~48% of 42,000 m complete as of late Aug; high-grade subdomain vertical extent up 17% to 644 m (RK-26-293). PCE resource timing not given.

Log

Source: NexGen expands Patterson Corridor East uranium deposit by 17% · Aug 26, 2026

TBADrillingNioBay Metals TSXV:NBYCrevier · Quebec, CanadaDrill resultsNbTa

Timing as stated: unspecified

  • Program Summer 2026 drilling, minimum 5,000 m
  • Metres 5,000 m planned
  • Stage resource expansion
  • Context 72.5% interest; MRE updated Feb 25, 2026

Log

Source: NioBay Announces the Commencement of Summer Field Programs Across its Projects · Jun 23, 2026

TBADrillingNOA Lithium Brines TSXV:NOALRio Grande · Salta, ArgentinaCompletion of first production well and pumping test phaseLi

Timing as stated: unspecified

  • Program 2026 exploration/production well drilling, two rigs
  • Stage advanced/development
  • Context PW002 reached 504 m planned depth; PW001 at 254 m and drilling

Log

Source: NOA Lithium Provides Update on 2026 Exploration Drilling Program At Rio Grande Project · Jul 16, 2026

TBADrillingOmai Gold Mines TSXV:OMGOmai (Wenot, Gilt) · Potaro-Siparuni, GuyanaWenot infill/expansion results; BBH exploration drilling resultsAu

Timing as stated: unspecified

  • Program 50,000m 2026 program, 5 rigs at Wenot; sixth rig mobilised Oct 2026 for 8-hole ~5,000m BBH program west of Gilt
  • Metres 27,770 m done of 50,000 m
  • Assays pending Second NE Wenot anomaly hole; Gilt depth hole 26ODD-208
  • Stage advanced/development
  • Context Updated PEA planned Q3 2026 (Wenot pit + Gilt UG); completed metres as of June 24

Log

Source: Omai Gold Mobilizes Sixth Drill to Advance Exploration Targets · Oct 8, 2026

TBADrillingOsisko Metals TSX:OMGaspé Copper (Mines Gaspé) · Quebec, CanadaDrilling of possible third porphyry centreCuMoAg

Timing as stated: unspecified

  • Program Infill/expansion drilling to convert inferred to indicated/measured; test toward Mont Needle
  • Stage advanced/development
  • Context Oct 7 release reported 12 holes incl. 94 m at 1.47% Cu

Log

Source: Osisko recoupe 94 mètres à une teneur moyenne de 1,47 % cuivre à Mines Gaspé · Oct 7, 2026

TBADrillingPecoy Copper TSXV:PCUPecoy · Arequipa, PeruFifth rig and further assay resultsCuAuMoAg

Timing as stated: unspecified

  • Program Fully funded 2026 drill program; four rigs turning, fifth planned
  • Metres 35,000 m planned
  • Assays pending Substantial assays still to come (not quantified)
  • Stage resource expansion

Log

Source: Four Rigs Now Turning at Pecoy · Sep 8, 2026

TBADrillingPerseverance Metals TSXV:PMILac Gayot · Nunavik/Northern Quebec, CanadaLac Gayot drill resultsNiCuCoPt

Timing as stated: unspecified

  • Program Summer 2026 drill program, minimum 5,000m
  • Metres 5,000 m planned
  • Stage discovery
  • Context Laurentia Exploration operates the work.

Log

Source: Perseverance Metals Launches Summer 2026 Drill Program at the Lac Gayot Project, Quebec · Jul 22, 2026

TBADrillingPerseverance Metals TSXV:PMIVoyageur · Upper Peninsula, Michigan, United StatesFirst results from top-priority targetNiCuCoPt

Timing as stated: unspecified

  • Program Inaugural drill program (delayed by equipment delivery)
  • Stage grassroots
  • Context Rig on site, first target testing to begin week of 22 Jul 2026.

Log

Source: Perseverance Metals Launches Summer 2026 Drill Program at the Lac Gayot Project, Quebec · Jul 22, 2026

TBADrillingPremier American Uranium TSXV:PURKaycee ISR (West Diane, Rustler) · Wyoming, Powder River Basin, USACompletion of remaining ~1/3 of program; Rustler drilling resumesU

Timing as stated: unspecified

  • Program 100,000 ft exploration drill program
  • Metres 20,001 m done of 30,480 m
  • Stage resource expansion
  • Context Feet converted: 65,620 ft in 80 holes of 100,000 ft as of Sep 25; WD26-012 10 ft at 0.064% eU3O8.

Log

Source: Premier American Uranium Reports 10 ft of 0.064% eU3O8 in Ongoing Drilling at Kaycee, Wyoming · Oct 7, 2026

TBADrillingRocky Shore Gold CSE:RSGGold Anchor (Lane Pond) · Newfoundland (central), CanadaLane Pond drill results; possible Mosquito Hill/Reid follow-upAu

Timing as stated: unspecified

  • Program ~3,500 m, 15-20 reconnaissance holes, phase 1
  • Metres 3,500 m planned
  • Assays pending Not stated
  • Stage grassroots
  • Context First drilling of undrilled 1,500 x 600 m Lane Pond target

Log

Source: Rocky Shore Gold Commences Drill Program At The Gold Anchor Project · Apr 16, 2026

TBADrillingSitka GoldRC Gold (Rhosgobel, Blackjack) · Yukon (Tombstone Gold Belt), CanadaContinued assay releases; resource update (timing not stated)AuW

Timing as stated: unspecified

  • Program 60,000 m diamond, 7 rigs, launched Feb 2026
  • Metres 45,000 m done of 60,000 m
  • Assays pending Additional holes pending (count not given), incl. visible gold ~60 m further east
  • Stage resource expansion
  • Context DDRCRG-26-071: 256.9 m @ 0.84 g/t Au; Rhosgobel extended ~350 m east, now ~1.6 km strike

Log

Source: Sitka extends Rhosgobel gold eastward · Sep 9, 2026

TBADrillingStar Copper CSE:STCUStar (Star East, Star North, Copper Creek) · British Columbia, CanadaFirst assay results to prioritize follow-upCuAu

Timing as stated: unspecified

  • Program Fully funded 15,000 m diamond program
  • Metres 1,054 m done of 15,000 m
  • Assays pending First four holes at ACT Labs
  • Stage discovery
  • Context Golden Triangle

Log

Source: Star Copper Completes Initial Four Diamond Drill Holes · Jul 20, 2026

TBADrillingTalon Metals TSX:TLOMichigan exploration (Roland, Boulderdash) · Upper Peninsula, Michigan, United StatesMichigan drill resultsNiCu

Timing as stated: unspecified

  • Program Exploration drilling resumed at Roland and Boulderdash
  • Stage grassroots
  • Context Rio Tinto is JV partner on Tamarack (Talon 51%); US Dept of War US$20.6m exploration grant; owns Eagle Mine/Humboldt Mill.

Log

Source: Talon Metals Corporate Update · Jul 9, 2026

TBADrillingVizsla CopperPalmer (AG deposit) · Haines, Southeast Alaska, United StatesFurther infill resultsZnCuAgAu

Timing as stated: unspecified

  • Program Infill drilling at AG deposit
  • Stage resource expansion
  • Context CMR26-215: 21.2m @ 4.79% Zn, 116.9 g/t Ag. Program size not in source.

Log

Source: Vizsla Copper Reports 21.2 Metres Grading 4.79% Zinc at Palmer · Oct 7, 2026

TBADrillingVizsla Copper TSXV:VCUPoplar (Thira discovery) · British Columbia, CanadaFurther Thira step-out results; summer program at Palmer (Alaska)CuMo

Timing as stated: unspecified

  • Program Up to 8,000 m, ~16 holes, two rigs at Thira, Copper Pond and Camp Lake
  • Metres 8,000 m planned
  • Stage discovery
  • Context Thira extended ~200 m north (TH26-151) per April 2026 results

Log

Source: Vizsla Copper Plans Aggressive Drill Program Across the Thira Alteration Corridor, Poplar Project · Jan 14, 2026

TBADrillingXcite Uranium / Eagle Plains Resources CSE:XRI; TSXV:EPLBlack Bay · Saskatchewan, Uranium City district, CanadaDrill resultsU

Timing as stated: unspecified

  • Program Fall 2026 diamond drilling, 6 holes, 2 rigs
  • Metres 1,300 m planned
  • Stage grassroots
  • Context ~C$975k 2026 drill budget; Xcite earning up to 80%.

Log

Source: Eagle Plains Partner Xcite Uranium Commences Drill Program at the Black Bay Project, Adds Second Drill · Oct 5, 2026

TBADrillingYukon Metals CSE:YMCAZ and Birch · Yukon, CanadaDrill resultsCuAu

Timing as stated: unspecified

  • Program Fully funded 5,000 m (~2,000 m AZ, ~3,000 m Birch)
  • Metres 5,000 m planned
  • Stage grassroots
  • Context Porphyry and skarn targets

Log

Source: Yukon Metals kicks off 2026 drilling · Jun 3, 2026

TBAPlannedElemental Royalty (Bronco Creek) / KGHM TSX:ELERoyston, Big E, Tango, Whiskey · Nevada, USAExploration under six-year earn-inCu

Timing as stated: unspecified

  • Program Earn-in: KGHM's Robinson Holdings can earn 100% of each project by funding up to US$5M exploration
  • Stage grassroots
  • Context Elemental retains 2% NSR on earned projects

Log

Source: Elemental Royalty Executes Agreement with KGHM Subsidiary to Option and Explore Four Porphyry Copper Projects in Nevada · May 27, 2026

H2PlannedPower Metallic Mines TSXV:PNPNJabal Baudan licence · Arabian Shield, Saudi ArabiaFirst Saudi drill programCu

Timing as stated: unspecified in company release (H2 2026 per Crux interview)

  • Program Jabal Baudan licence (Jabal Sayid belt, >200 km2) plus Amaar Mining JV for future licences; staged reconnaissance/targeting. 3,000-5,000m first drill program cited only in Crux interview, not company release
  • Stage grassroots
  • Context Management plan per interview article; concessions not individually named. metres_planned uses top of range.

Log

Source: Power Metallic Announces Expansion in the Kingdom of Saudi Arabia via Joint Venture with Amaar Mining · May 19, 2026

TBAPlannedZacatecas Silver TSXV:ZACZacatecas Silver · Zacatecas, MexicoDrill start after administrative stepsAg

Timing as stated: unspecified

  • Program 4,000 m diamond program (Major Drilling)
  • Metres 4,000 m planned
  • Stage resource expansion
  • Context May re-model existing estimates

Log

Source: Zacatecas Silver Provides Corporate Update for 2026 · Jan 8, 2026

TBACompleteAbraSilver Resource TSX:ABRALa Coipita · San Juan, ArgentinaNext drill campaign guided by MT survey; JV formationCuAuMo

Timing as stated: unspecified

  • Program Teck-operated 2026 drilling: 7 holes, 5,248 m
  • Metres 5,248 m done
  • Stage discovery
  • Context Teck has spent ~US$23M vs US$20M earn-in; expected JV 80% Teck / 20% AbraSilver

Log

Source: AbraSilver Reports 2026 La Coipita Project Drill Results · Jun 15, 2026

TBACompleteAustin Metals ASX:AYTAustin (Brunswick Hill, Mt Sandy) · WA (Murchison), AustraliaFollow-up RC phase at Mt Sandy/Brunswick Hill after UAV magnetic survey and target rankingAu

Timing as stated: UAV mag survey from Oct 2026; next RC phase unscheduled

  • Program 21-hole RC program
  • Metres 4,216 m done
  • Assays pending All 21 holes
  • Stage discovery

Log

Source: Drilling Advances Gold Potential at Mt Sandy and Brunswick Hill · Sep 9, 2026

TBACompleteBlue Star Gold TSXV:BAUUlu / Auma (Bamako, Penny Lane, North Nutaaq) · Nunavut (High Lake belt), CanadaFurther phase 2 results; follow-up on Bamako systemAu

Timing as stated: unspecified

  • Program Phase 2: 6,552 m across 10 gold and critical-mineral targets, 2 rigs
  • Metres 6,552 m done
  • Assays pending Not stated
  • Stage resource expansion
  • Context Ulu resource (May 2026): 558 koz M&I @ 7.87 g/t + 476 koz Inferred @ 4.54 g/t

Log

Source: Blue Star ends Auma season on two fronts · Sep 25, 2026

TBACompleteCanagold Resources TSX:CCMNew Polaris · BC (northwest, near Juneau), CanadaNot statedAuSb

Timing as stated: unspecified

  • Program 7,277 m in 14 holes (antimony-focused)
  • Metres 7,277 m done
  • Assays pending Not stated
  • Stage advanced/development
  • Context Hit 30% antimony and 49 g/t gold; historical underground mine

Log

Source: Canagold drills 30% antimony, 49 g/t gold · Oct 1, 2026

TBACompleteCornish Metals AIM:TINSouth Crofty (Roskear West) · Cornwall, UKFurther drilling to test resource expansion west and tungsten zonesSnWCu

Timing as stated: unspecified

  • Program 2026 surface drilling, two holes
  • Metres 2,330 m done
  • Stage advanced/development
  • Context Final assays released; new high-grade tungsten and copper zones

Log

Source: Further Positive Assay Results from Roskear Drilling Programme · Oct 1, 2026

TBACompleteDios Exploration TSXV:DOSAu33 (Heberto) · Quebec (James Bay), CanadaFollow-up NNW extension and Bonano soil anomaliesAu

Timing as stated: unspecified

  • Program 9 holes, 1,772 m
  • Metres 1,772 m done
  • Assays pending None
  • Stage discovery
  • Context Extended Heberto footprint 600 m to 900 m; 2.61 g/t over 5.25 m

Log

Source: DIOS Intersects Gold in 2026 Drilling Program and Extends Heberto's Footprint from 600 Meters to 900 Meters · Oct 14, 2026

TBACompleteGeopacific Resources ASX:GPRWoodlark · Milne Bay, Papua New GuineaGeological model review; integration into future resource updatesAu

Timing as stated: unspecified

  • Program RC and diamond drilling, 29 holes (concluded May 2026)
  • Assays pending Bomagai BMDD26001 diamond tail; soil/auger geochem
  • Stage resource expansion
  • Context 1.98 Moz resource

Log

Source: Geopacific Resources Woodlark exploration results · Sep 2, 2026

TBACompleteGreat Southern Copper LSE:GSCUEspecularita (Cerro Negro) · Atacama, ChilePhase IV resource and exploration drilling at Cerro NegroCuAu

Timing as stated: unspecified

  • Program Phase III complete: 23 holes
  • Metres 3,955 m done
  • Assays pending All six RC holes and remaining diamond holes
  • Stage discovery
  • Context Viuda porphyry follow-up also planned

Log

  • Nov 1, 2026 Mar 23 2026: Phase III scout RC results reported (high-grade Ag/base metals in all reported RC holes); Phase IV program being planned. Not confirmed every diamond assay is out.
  • Jan 12, 2026 Tracked: Phase III complete: 23 holes

Source: Great Southern Copper Phase III Drilling Completed at Cerro Negro · Jan 12, 2026

TBACompleteSolstice Gold TSXV:SGCStrathy (Red Cedar) · Ontario (Temagami), CanadaFollow-up drill program; stripping and channel samplingAuAgZn

Timing as stated: unspecified

  • Program 14 holes, 3,087 m, winter 2026
  • Metres 3,087 m done
  • Assays pending None
  • Stage discovery
  • Context SGPDH26-04: 59.4 g/t Au over 0.5 m; polymetallic Leckie-style zone

Log

Source: Solstice Gold Expands Red Cedar Discovery · Jun 3, 2026

TBACompleteSouthern Hemisphere MiningLlahuin (Southern Porphyry) · Coquimbo, ChileDefine second-phase drill targetsCuAuMo

Timing as stated: unspecified

  • Program Phase one drilling at targets A, C, K, L
  • Stage discovery
  • Context JV with FMR Resources

Log

Source: Southern Hemisphere porphyry system, Llahuin, Chile · Jun 2, 2026

TBACompleteSumitomo Metal Mining Canada / Kenorland Minerals TSXV:KLDFrotet (Regnault) · Quebec (Frotet), CanadaResource update (timing not stated)Au

Timing as stated: unspecified

  • Program 14,980 m in 20 holes (fall 2025 + winter 2026)
  • Metres 14,980 m done
  • Assays pending None
  • Stage resource expansion
  • Context Maiden Inferred 2.55 Moz @ 5.47 g/t (Dec 2025); Kenorland holds 4% NSR; 12.15 m @ 26.33 g/t

Log

Source: Kenorland Frotet drill results release · Sep 29, 2026